Dry Testing with an Artificial Ocean
If it is not possible to test run the system with the boat in the water, you may test the system
with an artificial ocean. You will need 1.3 lbs. of non
-
iodized salt (rock salt, sea salt, or aquarium
salt) to make a 5 gallons (33 grams of salt per liter) of water that is about 33,000 PPM salinity
(average seawater salinity). Make sure the domestic water system is powered up and the boat
’
s
tank has at least 60 gallons (230 Liters) of water to purge the storage chemicals from the system.
Confirm that the charcoal filter is installed in the feed pump module, and the domestic water
line is connected.
1.
Open the pressure relief valve on the Clark Pump. Remove the green tag and spacer.
2.
Power up the system. When the Spectra Connect displays
“
Has the system been stored with
chemicals?
”
, select
“
No
”
to bypass the purge mode.
3.
Press the
Fresh Water Flush
button to run a full flush cycle. Do this
six
times to purge the
storage chemicals, a 36 minute process.
4.
Replace the brine overboard hose with the brine service hose per figure 1.
5.
Push the
Fresh Water Flush
button again to fill the bucket with fresh water from the brine
discharge service hose (hose attached to Clark Pump). Press
Stop
when the bucket is full.
6.
Mix the salt to the proper proportion or use an aquarium hydrometer to adjust the salinity
level to a specific gravity of 1.025.
7.
Disconnect the quick release fitting from the pigtail coming from the charcoal filter housing
outlet and connect the intake service hose per Figures 2. Route both service hoses into a 5
gallon (20 liter) bucket. Disconnect the product tube from the diversion valve manifold, and
using another small piece of tube, route it into the bucket.
8.
Push the
Start
button, then press
Auto Run
and program the Connect to make
10 gal (38 L)
of water, roughly 45 minutes of operation.
9.
Allow the system to prime and then close the pressure relief valve. The system should build
pressure shortly and start making water, with the brine and product water recombining in
the bucket to be cycled again. This will gradually heat the water. Do not let the water
temperature exceed 120 deg. F (49 deg. C).
10.
Run the system under pressure, checking for proper operation and leaks. After testing the
system, re
-
install the brine discharge hose, product tube, and fresh water hose from the
strainer. You can now flush the system by pressing the
Fresh Water Flush
button.
Remove tag
and washer
OPEN PRESSURE
RELIEF VALVE
Fig. 1
Fig. 2
Содержание Spectra Catalina 340C
Страница 2: ...2...
Страница 15: ...15 John Guest Super Speedfit Fittings...
Страница 50: ...50 This page intentionally left blank...
Страница 64: ...64 Wiring Schematic...
Страница 71: ...71 HP TB VEB B HP TB VB HP TB VEB A HP TB BV HP CB CB10 HP CYL SST HP CYL R HP CYL EC HP CYL CCA Not used...
Страница 73: ...73 Parts 1...
Страница 74: ...74 Parts PL MTS 3 8X1 2B HP CYL SST HP CYL CCA SO HPP ECCB HP CYL EC HP CYL R HP CYL PT Parts...
Страница 78: ...78...
Страница 80: ...80...
Страница 83: ...83...