23
Commissioning
New System Start
-
Up and Testing
Use this procedure when starting a new watermaker for the first time and
whenever the
system contains preservative or cleaning chemicals.
Avoid running the system if the vessel is in contaminated water, such as a dirty harbor or
canal. The system should be fully run tested before leaving on an extended journey. It is
preferable to sacrifice a pre
-
filter by testing the system briefly in turbid water rather than
waiting to get offshore to discover a problem or deficiency in the installation. If the location or
weather prevents proper testing refer to the section Dry Testing with an Artificial Ocean.
1.
First Check That:
•
Seacock is open
•
Toggle switch on the Feed Pump
Module is in the Run Auto position
•
Domestic fresh water pressure system
is on.
2.
Open pressure relief valve 1/2 turn and remove the
Green Tag and washer!
3.
Turn on the power to the system and the Spectra Connect screen will display,
“
Has the
system been stored with chemicals?
”
Press
‘
Yes
’,
to start the Purge sequence. Note: The
watermaker will shut down if the pressure relief valve is left closed during the Purge mode.
•
Alarm will sound
•
Display will read
“
Has the
system been stored with
chemicals?
”
•
Confirm the Pressure Relief
Valve is open
•
Press
‘
Yes
’
to start the Purge
sequence
Warning! Damage may occur if the purge sequence is bypassed and
the membrane is pressurized with storage chemical in it.
Содержание Spectra Catalina 340C
Страница 2: ...2...
Страница 15: ...15 John Guest Super Speedfit Fittings...
Страница 50: ...50 This page intentionally left blank...
Страница 64: ...64 Wiring Schematic...
Страница 71: ...71 HP TB VEB B HP TB VB HP TB VEB A HP TB BV HP CB CB10 HP CYL SST HP CYL R HP CYL EC HP CYL CCA Not used...
Страница 73: ...73 Parts 1...
Страница 74: ...74 Parts PL MTS 3 8X1 2B HP CYL SST HP CYL CCA SO HPP ECCB HP CYL EC HP CYL R HP CYL PT Parts...
Страница 78: ...78...
Страница 80: ...80...
Страница 83: ...83...