43
KaDeck
3.26
Versatile air conditioning for offices and administration buildings
Installation and operating instructions
Interval
Work
36 months
Hygiene inspection
12 months
Check outside air opening for dirt and corrosion
12 months
Check secondary air filter for dirt, and replace if necessary
12 months
Randomly check all components that come into contact with secondary air
6 months
Randomly check the air filter and heat exchanger for dirt on units without accessories, clean if necessary
6 months
With dry cooling units, check heat exchangers and condensation tray for dirt, damage, corrosion and leak-
tightness, and clean if necessary
3 months
With wet cooling units, check heat exchangers, condensation tray and drain for dirt, damage, corrosion and
leak-tightness, and clean if necessary
8.3 Maintenance work
Personnel:
Caretakers/users
Protective
Protective gloves
equipment:
Goggles
Lightweight breathing protection
The following safety instructions apply to all
relevant maintenance work.
CAUTION!
Risk of injury from sharp metal housing!
The inner metal of the casing can have sharp edges.
Wear suitable protective gloves.
WARNING!
Risk of injury from rotating parts!
The fan impeller can cause severe injuries.
Switch off the unit and prevent if from
reconnection before commencing any work on
moving components of the fan. Wait until all
parts have come to a standstill.