Operation
ProLine 2200 User’s Manual REV N
This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to
non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.
4-1
Section 4 Operation
Power Supply Front Panel Controls
All of the ProLine controls and status indicator lights are located on the front panel of the
system. This section describes the function of each control and indicator.
Figure 4-1 Front Panel Controls
Power Off Button
Deenergizes the ProLine system and turns off the cooling fans and coolant pump.
Power On Button/Indicator
Energizes the ProLine system and turns on the cooling fans and coolant pump.
Illuminates to show that the system is energized.
AC Power Indicator
Illuminates when 3 phase power is applied to the ProLine system.
DC Power Indicator
Illuminates when then main contactor has been energized and D.C. current is flowing
through the torch.
Motion Delay Potentiometer
Used to delay the x/y machine motion when piercing thicker materials. The delay can be
adjusted from 0 to 3 seconds.
1
3
4
5
2