05.10 EN
90
4.12.2 Operating the lift mechanism with the Multi Pilot
Lifting and lowering
Requirements
– To prepare the truck for operation, (see
"Preparing the truck for operation" on page 72)
Procedure
• Pull the Multi-Pilot (75) in direction H to raise
the load.
• Push the Multi Pilot (75) in direction S to lower
the load.
The load is now raised / lowered.
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically
to neutral.
Tilting the mast forward / backward
Requirements
– Truck prepared for operation, (see "Preparing
the truck for operation" on page 72).
Procedure
• Push the Multi-Pilot lever (75) in direction V to
tilt the mast forward.
• Push the Multi-Pilot lever (75) in direction R to
tilt the mast back.
The mast is now tilted back / forward.
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically
to neutral.
H
H
S
75
V
R
75
Содержание DFG 316s
Страница 3: ...05 10 EN 4...
Страница 9: ...05 10 EN 10...
Страница 13: ...05 10 EN 14...
Страница 21: ...05 10 EN 22...
Страница 31: ...05 10 EN 32...
Страница 37: ...05 10 EN 38...
Страница 127: ...05 10 EN 128...
Страница 175: ...05 10 EN 176 Z 1 LED optional equipment t Series equipment o Optional equipment...
Страница 187: ...05 10 EN 188...