Test Report No.: No.: 17706687 001
Part II of II
Page 16 of 63
EN 61029-1:2009+A11
Clause
Requirement
Test
Result - Remark
Verdict
11.4
Operating time
TS-315D: 1.06Ur: 90min,
0.94Ur: 90min
TS-315G: 1.06Ur: 77min,
0.94Ur: 119min
P
11.5
Thermal cut-outs not operate and temperature rise
not exceed table 2
Not applicable
N/A
11.6
Temperature rise of windings exceeding limits of
11.5
Limit of 11.5 not exceeded.
N/A
12
LEAKAGE CURRENT
P
12.1
Leakage current under normal use condition
The leakage current is
measured immediately after
the temperature rise test with
1.06Ur.
P
Measurement of leakage current .............................: The tool is switched on:
TS-315D:
L/N- Tool enclosure:
0.046/0.088mA
L/N- Switch box:
0.001/0.001mA
L/N- Motor enclosure:
0.049/0.090mA
TS-315G:
N- Tool enclosure:
0.039/0.085mA
N- Switch box: 0.001/0.001mA
N- Motor enclosure:
0.041/0.087mA
P
12.2
Conditions for measurement
P
Location of poles
P
Limits
Class I tool: 0.75mA
Class II tool: 0.25mA
P
Single pole switch
N/A
Tools with heating elements
N/A
13
ENVIRONMENT CONDITIONS
P
13.1
Dust measuring
N/A
Dust collecting device capability specified by the
manufacturer
N/A
Measurement of dust collecting capability ...............:
N/A
13.2
Noise
P
Содержание JTS-315LA
Страница 2: ......
Страница 3: ...8 JPW s CE declaration of conformity with latest directives and EN standards...
Страница 4: ...9 CE certificates...
Страница 5: ......
Страница 6: ......
Страница 17: ...Appendix A A1 A2 A3 A4...
Страница 19: ...Parts Breakdown for JTS 315LA Table Saw...
Страница 30: ......
Страница 41: ......
Страница 124: ...Circular Saw Bench...