Routine Maintenance
Tyres and Wheels
158
158
9811/5700-7
732160-V2
Fig 125.
Checking the Wheel Nut Torques
T3-014_3
!M
WARNING
If, for whatever reason, a wheel stud is renewed, all the
studs for that wheel must be changed as a set, since
the remaining studs may have been damaged.
2-3-2-8
On new machines, and whenever a wheel has been
removed, check the wheel nut torques every two hours
until they stay correct.
Every day, before starting work, check that the wheel nuts
are tight.
Tighten the wheel nuts (in a diagonal sequence) to the
torque value shown.
Table 6.
Front
Rear
Nm (lbf ft)
Nm (lbf ft)
680 (500)
680 (500)
Содержание RTFL 926
Страница 2: ...0 0 9811 5700 Notes...
Страница 8: ...Contents vi vi Page No Contents...
Страница 10: ...Safety Notices Important Information viii viii 9811 5700 7 Page left intentionally blank...
Страница 13: ...Introduction Machine Description 3 3 9811 5700 7 Fig 2...
Страница 87: ...Operation Refuelling a Machine 77 77 9811 5700 7 Fig 60...
Страница 90: ...Operation Transporting the Machine 80 80 9811 5700 7 298261 2 Fig 63...
Страница 124: ...Routine Maintenance Greasing 114 114 9811 5700 7 Daily Rear Axle Pivot Pin 2 Grease Points Fig 76...
Страница 125: ...Routine Maintenance Greasing 115 115 9811 5700 7 Rear Axle 14 grease points Fig 77...
Страница 127: ...Routine Maintenance Greasing 117 117 9811 5700 7 Mast Tilt Rams and Pivots 6 grease points Fig 80...
Страница 180: ...Optional Attachments Work Platforms 170 170 9811 5700 7 Page left intentionally blank...
Страница 196: ...Warranty Information Registration Information 186 186 9811 5700 7 Page left intentionally blank...
Страница 198: ...European Community Standards EC Declaration of Conformity 188 188 9811 5700 7 9814 0850 4 GB Fig 140...
Страница 200: ...European Community Standards EC Declaration of Conformity 190 190 9811 5700 7 Page left intentionally blank...