5. Mount the gauge wheel mounts (JM0047347) to the toolbar. Place the mounts to the outside of the outer
most coulter on the wings. The gauge wheel mounts face the front of the wing which is opposite of the
coulters (as shown below). Slide the gauge wheel arm weldment (JM0077668) into place and secure with a
hitch pin (JM0003079). Add the hub and spindle assembly (JM0026571) using a 1/2”-13 x 3” Gr5 Z hex bolt and
1/2”-13 Gr2 Z centerlock hex nut.
6. Mount the 4’ x 8” hydraulic cylinders (JM0030757) under the toolbar frame as shown below. Secure the
cylinders with 1” x 3-3/8” pins (JM0001817).
7. Connect the hoses from the top two ports of the valve bank on the main frame to the 4” x 8” hydraulic lift
cylinders. Reference the hydraulic schematic at the beginning of this manual to be sure on hose locations.
8. Connect the hoses (JM0041613) from the bottom two ports of the valve bank on the main frame to the 4” x 24”
hydraulic fold cylinders. These hoses will be labeled in red.
9. Set down pressure gauge at 650psi and test hydraulic functions.
Connecting Frame and Coulters to Toolbar