JBE-P2L1 Panel Manual V1.2 EN
Page 11
Release Date: January 5, 2021
Rev 01
1.
Prior to conducting wire connection works:
a.
Ensure that the mains power line is properly de-energized following a lock out / tag out
procedure.
b.
Verify that the panel batteries are not assembled.
2.
Route the following pairs of wire from the installation into the panel through separate cable glands and
screw their terminations to their corresponding connectors:
a.
Loop 1 side A
►Connect to position L1a (+ and -)
b.
Loop 1 side B
►Connect to position L1b (+ and -)
c.
Field 24V DC #1
►Connect to position 24Va (+ and -)
d.
Loop 2 side A
►Connect to position L2a (+ and -)
e.
Loop 2 side B
►Connect to position L2b (+ and -)
f.
Field 24V DC #2
►Connect to position 24Vb (+ and -)
g.
Fire alarm signal ►Connect to position “Fire” (normally open relay contact)
h.
Fault signal ►Connect to position “Fault” (normally open relay contact)
Figure 4: Loop Board Connections
3
. With the panel secure, run the mains power line into the panel and secure it to the provided mains terminal
block.
Figure 5: Mains Connections
This equipment must always be earthed