
Jabiru J450 Constructors Manual
Pre-Paint>Fuselage>Empennage>Fit vertical tail fin
Tuesday, April 6, 2010
93 of 343
Put a smear of super glue around the base of the static tube then slide the PVC tube over the
base of the static tube by at least 25mm and fix firmly in place with 2 lock wire ties.
Take particular care that the PVC tube is well secured to the static tube because once the static
probe assembly has been flocked in place there will be no access for repair work.
Push the static probe assembly back into the hole at the front top of the vertical fin so that the
static probe assembly is parallel with the top of the vertical fin and centred laterally in the fin.
Secure the static probe assembly in place with 5-minute Araldite and hold it in place while the
Araldite dries. Mix up a batch of resin and coat the area around the base of the static probe
assembly, and then add some flock to make a firm mix and shape around the base of the static
probe assembly to form a smooth transition from the static probe to the fin. Leave to cure
overnight and then sand to a smooth tapered finish.
This completes the
Pre-Paint>Fuselage>Empennage>Fit vertical fin
task.
Содержание J450
Страница 1: ...Jabiru J450 Constructors Manual from kit serial number 659...
Страница 42: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Undercarriage Fit main gear Tuesday April 6 2010 42 of 343...
Страница 95: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit elevator Tuesday April 6 2010 95 of 343...
Страница 105: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit rudder Tuesday April 6 2010 105 of 343...
Страница 119: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Pre fit handbrake Tuesday April 6 2010 119 of 343...
Страница 126: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Fit control stick Tuesday April 6 2010 126 of 343...
Страница 137: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Fuel system Tuesday April 6 2010 137 of 343...
Страница 167: ...Jabiru J450 Constructors Manual Pre Paint Wings Cut aileron cable openings Tuesday April 6 2010 167 of 343...
Страница 217: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 217 of 343...
Страница 218: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 218 of 343...
Страница 219: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 219 of 343...
Страница 220: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 220 of 343...
Страница 238: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 238 of 343...
Страница 240: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 240 of 343...