
Jabiru J450 Constructors Manual
Post-Paint>Fuselage>Firewall forward>Final assembly
Tuesday, April 6, 2010
270 of 343
Post-Paint>Fuselage>Firewall forward>Final assembly
Objectives of this task:
To complete all fitting work in the engine bay.
Materials required:
Card #15 “
Spares
‟
Card #22 „
Hot air mixer box
‟
Card #23 „
Oil bottle
‟
Card #25 „
Cabin heater
‟
Prepare the muffler
Fit the inlet air heat shroud to the muffler
with 2 large hose clamps: align the shroud as
pictured with the cutaway in the shroud just
touching the exhaust pipe.
Tighten the hose clamps firmly.
Fit the cabin heater heat exchanger to the
exhaust pipe and push up until it touches the
muffler and tighten the Allen head cap
screws.
Fit the muffler
Remove the red sealing caps from the ends
of the exhaust pipes and fit the pipes into the
inlet holes in the front of the muffler.
Hold the muffler in place by fitting the
supplied springs from the tags on the muffler
to the tags on the exhaust pipes as shown
arrowed in the photo at right.
Check if the muffler is touching on the set
screws (arrowed in purple in right) that hold
the cover directly above the muffler: if the
muffler
is
touching these screws it could
eventually wear a hole in the muffler, so
mark any spots where the set screws are
touching, remove the muffler and use a
hammer to tap a small indent into the top of
the muffler. Refit the muffler and recheck.
Heat
exchanger
Shroud
Hose
clamps
Spring
Spring
Set
screw
Содержание J450
Страница 1: ...Jabiru J450 Constructors Manual from kit serial number 659...
Страница 42: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Undercarriage Fit main gear Tuesday April 6 2010 42 of 343...
Страница 95: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit elevator Tuesday April 6 2010 95 of 343...
Страница 105: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit rudder Tuesday April 6 2010 105 of 343...
Страница 119: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Pre fit handbrake Tuesday April 6 2010 119 of 343...
Страница 126: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Fit control stick Tuesday April 6 2010 126 of 343...
Страница 137: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Fuel system Tuesday April 6 2010 137 of 343...
Страница 167: ...Jabiru J450 Constructors Manual Pre Paint Wings Cut aileron cable openings Tuesday April 6 2010 167 of 343...
Страница 217: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 217 of 343...
Страница 218: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 218 of 343...
Страница 219: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 219 of 343...
Страница 220: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 220 of 343...
Страница 238: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 238 of 343...
Страница 240: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 240 of 343...