Jabiru J450 Constructors Manual
Post-Paint>Fuselage>Fit panel mounted throttle
Tuesday, April 6, 2010
201 of 343
Post-Paint>Fuselage>Fit panel mounted throttle
Objectives of this task:
To fit the panel mounted throttle linkage to the instrument panel housing.
Materials required:
Resin and flock
Card # J4 “
Panel Mount Throttle
”
Fit the cross shaft bearing blocks
The throttle cross shaft is used to determine the side-to-side position for the bottom half of
each bearing block, so the first task is to assemble the cross shaft as shown above.
Now, working from the rear of the panel, make a
mark 50mm in from the bottom of the rear lip on
each side (as shown at left) and position the bottom
half of each bearing block behind each mark. Sit the
assembled cross shaft in each bearing block and
move the bottom half of each bearing block out
until the cross shaft has no side-to-side movement.
Make sure that the cross shaft is evenly spaced in
from each side of the panel, then mark the position
of each bearing block and flock each block in place,
using the cross shaft to keep the blocks in
alignment. Leave overnight to cure.
Next day run a 3/16” drill through each hole in the bearing block and drill
through the panel housing, then grease the throttle cross shaft, put each bearing
block cap in place and fix it to the panel housing with 3/16” screws, bearing
plates (shown at right), washers and Nyloc nuts and tighten the nuts to safety.
Too much tension will make the throttle stiff to move, so test the amount of
friction as you tighten the nuts.
Input lever
Output lever
Rod end
50mm
Cross shaft
Bearing blocks
Input levers
Output lever
Rear view of the panel showing the bearing blocks in place and the cross shaft ready for assembly.
Содержание J450
Страница 1: ...Jabiru J450 Constructors Manual from kit serial number 659...
Страница 42: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Undercarriage Fit main gear Tuesday April 6 2010 42 of 343...
Страница 95: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit elevator Tuesday April 6 2010 95 of 343...
Страница 105: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit rudder Tuesday April 6 2010 105 of 343...
Страница 119: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Pre fit handbrake Tuesday April 6 2010 119 of 343...
Страница 126: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Fit control stick Tuesday April 6 2010 126 of 343...
Страница 137: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Fuel system Tuesday April 6 2010 137 of 343...
Страница 167: ...Jabiru J450 Constructors Manual Pre Paint Wings Cut aileron cable openings Tuesday April 6 2010 167 of 343...
Страница 217: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 217 of 343...
Страница 218: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 218 of 343...
Страница 219: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 219 of 343...
Страница 220: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 220 of 343...
Страница 238: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 238 of 343...
Страница 240: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 240 of 343...