
Jabiru J450 Constructors Manual
Testing>Final inspection checklist
Tuesday, April 6, 2010
317 of 343
Instrument panel
1
Secure and level
2
Instruments square (check that the slip/skid ball is centred).
3
Slip/skid ball air bubble not visible
4
Circuit breakers secure and correctly labelled
5
Switches secure and correctly labelled
6
Registration number displayed on panel
7
Mag switch guard in place and square with rounded edges
8
All instruments fitted and operational *
9
Instrument markings correct
10
Altimeter QNH correct
11
All avionics installed and operational
12
Cigarette lighter / 12v power fitting installed
* Fit 1 metre of rolled up surgical tubing to the brass static tube connector under the panel.
Watch the pressure instruments while slowly unrolling the tubing. The altimeter should start
to show an increase in altitude. The vertical speed indicator should start to show a positive
rate of climb and the airspeed indicator may show a small positive indication.
When the altimeter shows 2000 feet pinch off the tubing. There will be some initial decrease
in altitude and the vertical speed indicator will read zero. The altimeter should then hold the
indicated altitude for at least one minute. If altitude is lost then look for leaks.
Note: NEVER apply suction orally or mechanically to a static line - it can damage the
instruments.
Flaps
1
Mounting bolts secure
2
Rod end bolt secure: motor end and flap shaft ends
3
Rod end not binding in any position
4
Safety hole is within limits on rod end
5
Jam nut on rod end secured
6
Visual on input switch (knob shape, operation and decal)
7
Visual on bearing blocks
8
Check all nuts are in safety
Flap indicator
1
Secure and correct indication:
a)
Flaps up
b)
First stage: half flap
c)
Second stage: full flap
Содержание J450
Страница 1: ...Jabiru J450 Constructors Manual from kit serial number 659...
Страница 42: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Undercarriage Fit main gear Tuesday April 6 2010 42 of 343...
Страница 95: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit elevator Tuesday April 6 2010 95 of 343...
Страница 105: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit rudder Tuesday April 6 2010 105 of 343...
Страница 119: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Pre fit handbrake Tuesday April 6 2010 119 of 343...
Страница 126: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Fit control stick Tuesday April 6 2010 126 of 343...
Страница 137: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Fuel system Tuesday April 6 2010 137 of 343...
Страница 167: ...Jabiru J450 Constructors Manual Pre Paint Wings Cut aileron cable openings Tuesday April 6 2010 167 of 343...
Страница 217: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 217 of 343...
Страница 218: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 218 of 343...
Страница 219: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 219 of 343...
Страница 220: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 220 of 343...
Страница 238: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 238 of 343...
Страница 240: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 240 of 343...