
Jabiru J450 Constructors Manual
Post-Paint>Fuselage>Assemble instrument panel
Tuesday, April 6, 2010
211 of 343
Wiring standards
Before you start wiring the panel we suggest that you follow a few wiring standards:
All wires and connectors will be identified by a colour coded heat-shrink tag or label,
Wiring insulation will be stripped back 4mm for all connectors,
All wires will be crimped into the appropriate connectors using a crimping tool,
No more than 2 wires will be crimped into any one connector.
Heat shrink tubing should be cut into short lengths (about 2 or 3mm) and used for tagging
each electrical connector or wire in the following manner:
Red = positive
Black = negative (earth)
White = signal
Cut about 20 of each colour to start with and cut more as needed.
Put a strip of masking tape along the bottom rear of the panel under the switches and circuit
breakers and label each one – this will save you having to keep lifting the panel to read the
labels on the front and that will make the wiring a little bit easier.
Wiring the panel
This is a one-wire-at-a-time process that cannot be rushed.
The objective is to use lengths of wire that can later be zip-tied together to form a tidy wiring
loom. The
before
and
after
photos below show how factory wiring is arranged into a loom:
From this:
(We use pre-
cut wire
lengths for
our standard
panel layouts)
To this:
Содержание J450
Страница 1: ...Jabiru J450 Constructors Manual from kit serial number 659...
Страница 42: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Undercarriage Fit main gear Tuesday April 6 2010 42 of 343...
Страница 95: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit elevator Tuesday April 6 2010 95 of 343...
Страница 105: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit rudder Tuesday April 6 2010 105 of 343...
Страница 119: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Pre fit handbrake Tuesday April 6 2010 119 of 343...
Страница 126: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Fit control stick Tuesday April 6 2010 126 of 343...
Страница 137: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Fuel system Tuesday April 6 2010 137 of 343...
Страница 167: ...Jabiru J450 Constructors Manual Pre Paint Wings Cut aileron cable openings Tuesday April 6 2010 167 of 343...
Страница 217: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 217 of 343...
Страница 218: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 218 of 343...
Страница 219: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 219 of 343...
Страница 220: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 220 of 343...
Страница 238: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 238 of 343...
Страница 240: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 240 of 343...