
Jabiru J450 Constructors Manual
Pre-Paint>Fuselage>Empennage>Fit vertical tail fin
Tuesday, April 6, 2010
90 of 343
Reinforce the fin spar
Coat the foam wedge that you cut previously with resin and fit it into place at the base of the
fin spar channel, with the bottom resting on the horizontal stabiliser.
Apply flock to smooth the transition between the block and the vertical fin and the block and
the horizontal stabiliser.
Open the bag labelled “
Outer Reo Tail Fin
” and take out the 6 “T” shaped pieces of glass
fibre cloth: the top of the “T” is intended to be fitted inside the fin reinforcing channel while
the rest of the cloth is fixed to the top of the horizontal stabiliser as shown above right.
Apply the 6 layers of glass fibre cloth from the bag labelled “
Tail Fin
” to the inside of the fin
spar channel, starting with the smallest layer first and progressively adding each longer layer
until complete as shown on the drawing below. No peel cloth is required.
Vertical fin
Horizontal stabiliser
Содержание J450
Страница 1: ...Jabiru J450 Constructors Manual from kit serial number 659...
Страница 42: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Undercarriage Fit main gear Tuesday April 6 2010 42 of 343...
Страница 95: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit elevator Tuesday April 6 2010 95 of 343...
Страница 105: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit rudder Tuesday April 6 2010 105 of 343...
Страница 119: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Pre fit handbrake Tuesday April 6 2010 119 of 343...
Страница 126: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Fit control stick Tuesday April 6 2010 126 of 343...
Страница 137: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Fuel system Tuesday April 6 2010 137 of 343...
Страница 167: ...Jabiru J450 Constructors Manual Pre Paint Wings Cut aileron cable openings Tuesday April 6 2010 167 of 343...
Страница 217: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 217 of 343...
Страница 218: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 218 of 343...
Страница 219: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 219 of 343...
Страница 220: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 220 of 343...
Страница 238: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 238 of 343...
Страница 240: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 240 of 343...