
Jabiru J450 Constructors Manual
Testing>Final inspection checklist
Tuesday, April 6, 2010
312 of 343
Nose leg and housing
1
Front tyre pressure checked: 34 psi
2
[Tyre Pressure] decal in place on spat above grommet
3
Nose wheel - ease of rotation
4
Nose leg – lubricated and ease of rotation left to right
5
Assembly – all bolts secure in nose leg
6
Housing bolts secure
7
Rod ends secure both sides
8
Safety hole in rod ends within limits
9
Jam nuts on rod ends secure
10
Air valve grommet in place
11
Spat retaining screws secure
12
Centring springs do not become coil bound full deflection
Electrical
1
Battery tie down secure
2
Battery terminals secure
3
Battery earth secure on firewall
4
Starter solenoid locknuts and wires secure
5
Regulator wires secure and correct
6
Temp sender wires secure (EOT and CHT) plus EGT if fitted
7
All wiring cable tied and secure
8
Oil pressure wire correct and secure (G terminal)
Cowls
1
Top and bottom cowl alignment correct (no gaps)
2
Retained nuts secure and correct
3
Oil door operational
4
Spinner not touching front of cowl and Propeller
5
Oil cooler not touching bottom cowling
6
Cylinder heads not touching top or bottom cowling
7
NACA duct secure with no sharp edges
8
Cam locks secure and operational
Содержание J450
Страница 1: ...Jabiru J450 Constructors Manual from kit serial number 659...
Страница 42: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Undercarriage Fit main gear Tuesday April 6 2010 42 of 343...
Страница 95: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit elevator Tuesday April 6 2010 95 of 343...
Страница 105: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit rudder Tuesday April 6 2010 105 of 343...
Страница 119: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Pre fit handbrake Tuesday April 6 2010 119 of 343...
Страница 126: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Fit control stick Tuesday April 6 2010 126 of 343...
Страница 137: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Fuel system Tuesday April 6 2010 137 of 343...
Страница 167: ...Jabiru J450 Constructors Manual Pre Paint Wings Cut aileron cable openings Tuesday April 6 2010 167 of 343...
Страница 217: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 217 of 343...
Страница 218: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 218 of 343...
Страница 219: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 219 of 343...
Страница 220: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 220 of 343...
Страница 238: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 238 of 343...
Страница 240: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 240 of 343...