
Jabiru J450 Constructors Manual
Post-Paint>Fuselage>Interior>Fit flap drive motor
Tuesday, April 6, 2010
249 of 343
Post-Paint>Fuselage>Interior>Fit flap drive motor
Objectives of this task:
To fit the flap drive motor and actuating assembly.
Materials required:
Card J16 “
Electric Flaps
”
Fit the flap shaft
Remove the inner flap drive arm from the flap drive shaft by removing the 2 x AN3 bolts and
pulling the flap drive arm completely off of the shaft.
Feed the bare shaft into the cabin through the flap shaft
mount in the top left of the cabin, first taking care that
the bolt holes for the inner flap drive arm will end up
on the right-hand side of the cabin, and slip the inner
flap drive arm over the shaft before the shaft exits the
cabin through the right side flap shaft mount.
Ensure that the flap drive arm will be 180° away from
the outer flap drive arms as shown above in red.
Refit the inner flap drive arm with the AN3 bolts, flat
washers and Nyloc nuts and tighten the nuts to safety.
Fit the outer flap drive arms to each end of the flap
shaft and secure each with an AN3 bolt and Nyloc nut
as shown at right. Tighten the nuts to safety.
Prepare the flap drive motor assembly
Rivet the 3 captive nuts to the mounting bracket as shown below right:
Fit the large rod end and lock nut to the end of
the actuating rod on the electric flap motor and
thread fully into the rod.
Bolt the mounting bracket to the post on the
gear case of the flap motor assembly by
placing a Bundy tube through the post and then
bolting through the bracket and the post.
Refer to the photo on the next page for detail.
Содержание J450
Страница 1: ...Jabiru J450 Constructors Manual from kit serial number 659...
Страница 42: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Undercarriage Fit main gear Tuesday April 6 2010 42 of 343...
Страница 95: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit elevator Tuesday April 6 2010 95 of 343...
Страница 105: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit rudder Tuesday April 6 2010 105 of 343...
Страница 119: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Pre fit handbrake Tuesday April 6 2010 119 of 343...
Страница 126: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Fit control stick Tuesday April 6 2010 126 of 343...
Страница 137: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Fuel system Tuesday April 6 2010 137 of 343...
Страница 167: ...Jabiru J450 Constructors Manual Pre Paint Wings Cut aileron cable openings Tuesday April 6 2010 167 of 343...
Страница 217: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 217 of 343...
Страница 218: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 218 of 343...
Страница 219: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 219 of 343...
Страница 220: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 220 of 343...
Страница 238: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 238 of 343...
Страница 240: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 240 of 343...