
Jabiru J450 Constructors Manual
Pre-Paint>Wings>General
Tuesday, April 6, 2010
157 of 343
Pre-Paint>Wings>General
In our factory we combine several smaller tasks on the wing into the one three day operation:
we work on the top surface first, starting with the fuel filler body and then the winglet, then
we move to the wing root and install the fuel fittings, fit the breather tube and cut the recess
for the flap arm. The next day we turn the wing over and work on the bottom surface, cutting
the aileron cable mount inspection hole, fitting the flaps and the quick drains, and then on the
third day we fit the ailerons. Other minor tasks, such as fitting the strobe mounts, can be done
at any time.
In this section of the manual each step of the operation is broken out as one of a series of tasks
that are ordered in the sequence that we would normally perform them.
The homebuilder could (and should) follow the same sequence but with the whole operation
spread over several days, perhaps at a rate of one task per day.
We support each wing on a pair of trestles that place the wing at a convenient height for
working, about 900mm high or bench height, and we cover the tops of the trestles in carpet to
protect the wing surface. When working on the bottom of the wing we use a foam wedge on
each trestle under the rear of the wing to stop the wing from rocking when the curved surface
is facing downwards.
Tools
may
be placed on the wing surface while you are working but you
must
take care not to
drop
anything onto the wing surface – the surface is not designed for that type of loading, so
treat it with respect and place your tools carefully and gently onto it.
Содержание J450
Страница 1: ...Jabiru J450 Constructors Manual from kit serial number 659...
Страница 42: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Undercarriage Fit main gear Tuesday April 6 2010 42 of 343...
Страница 95: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit elevator Tuesday April 6 2010 95 of 343...
Страница 105: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Empennage Fit rudder Tuesday April 6 2010 105 of 343...
Страница 119: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Pre fit handbrake Tuesday April 6 2010 119 of 343...
Страница 126: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Console Fit control stick Tuesday April 6 2010 126 of 343...
Страница 137: ...Jabiru J450 Constructors Manual Pre Paint Fuselage Interior Fuel system Tuesday April 6 2010 137 of 343...
Страница 167: ...Jabiru J450 Constructors Manual Pre Paint Wings Cut aileron cable openings Tuesday April 6 2010 167 of 343...
Страница 217: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 217 of 343...
Страница 218: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 218 of 343...
Страница 219: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 219 of 343...
Страница 220: ...Jabiru J450 Constructors Manual Post Paint Fuselage Electrical wiring diagrams Tuesday April 6 2010 220 of 343...
Страница 238: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 238 of 343...
Страница 240: ...Jabiru J450 Constructors Manual Post Paint Fuselage Interior Fit console controls Tuesday April 6 2010 240 of 343...