WORK ON THE BRAKING SYSTEM
51
–
Printed 603.95.747
–
1st Ed. - Base 12/2013
Before inserting the pipe into the coupling, screw the coupling into the threaded insert of the same component (e.g. pneumatic
valve), using the following values for tightening:
Thread
Tightening torque [Nm
±
10%]
M12 x 1.5 mm
20
M14 x 1.5 mm
24
M16 x 1.5 mm
30
M22 x 1.5 mm
34
Insert the pipe into the coupling for the previously marked stretch of length L, using a force of between 30 and 120 N, depending
on the size of the tube.
The replacement of components (valves, etc..) is made possible because the engagement and coupling allow an internal rotation
during the operation of unscrewing and screwing.
Vehicle pipe installation
Before use, the new pipes must be thoroughly cleaned inside, for example by blowing air with a compressor.
The pipes must be fixed to the frame with elements which envelop the pipe completely and which may be metal with
rubber/plastic protection or be made of plastic material.
Provide appropriate distances between one fastening element and the other: generally, max. 500 mm for plastic pipes and max.
600 mm for metal pipes can be considered.
In order to avoid deformations and tensions at the time of closure of the couplings for the plastic pipes, it is necessary to take care
of the line and the accommodation of the fastening elements, rubbing should be avoided with the fixed parts of the vehicle and
meet the necessary safety distances from moving parts and heat sources.
In passing the pipes through the chassis (side members or crossbars), take precautions to avoid damage. One solution would be to
use a coupling passing directly through or at an angle, or a rubber protective eyelet, as shown in Figure 2.25.
193866
Figure 25
1.
Pipe
2.
Through-coupling
3.
Chassis
4.
Rubber protection
▶
After each intervention is on the system or equipment, brake efficiency should be checked.
▶
Bring the pressure to its maximum level on the air system. Check for leaks in the areas affected
by the intervention.
Содержание EUROCARGO
Страница 1: ...EUROCARGO EURO 6 M E D I U M R A N G E BODYBUILDERS INSTRUCTIONS ISSUE 2013 ...
Страница 4: ... Printed 603 95 747 Base 12 2013 ...
Страница 6: ... Printed 603 95 747 Base 12 2013 ...
Страница 8: ... Printed 603 95 747 Base 12 2013 ...
Страница 9: ... Printed 603 95 747 Base 12 2013 SECTION 1 GENERAL INFORMATION ...
Страница 10: ... Printed 603 95 747 Base 12 2013 ...
Страница 12: ...4 EUROCARGO Euro 6 GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 747 1st Ed Base 12 2013 ...
Страница 28: ...20 EUROCARGO Euro 6 GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 747 1st Ed Base 12 2013 ...
Страница 29: ... Printed 603 95 747 Base 12 2013 SECTION 2 CHASSIS INTERVENTIONS ...
Страница 30: ... Printed 603 95 747 Base 12 2013 ...
Страница 91: ... Printed 603 95 747 Base 12 2013 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES ...
Страница 92: ... Printed 603 95 747 Base 12 2013 ...
Страница 135: ... Printed 603 95 747 Base 12 2013 SECTION 4 POWER TAKE OFFS ...
Страница 136: ... Printed 603 95 747 Base 12 2013 ...
Страница 138: ...4 EUROCARGO Euro 6 POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 747 1st Ed Base 12 2013 ...
Страница 160: ...26 EUROCARGO Euro 6 POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 747 1st Ed Base 12 2013 ...
Страница 161: ... Printed 603 95 747 Base 12 2013 SECTION 5 ELECTRONIC SUB SYSTEMS ...
Страница 162: ... Printed 603 95 747 Base 12 2013 ...
Страница 164: ...4 EUROCARGO Euro 6 ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 747 1st Ed Base 12 2013 ...
Страница 215: ... Printed 603 95 747 Base 12 2013 SECTION 6 SPECIAL INSTRUCTIONS FOR SCR EXHAUST SYSTEM ...
Страница 216: ... Printed 603 95 747 Base 12 2013 ...
Страница 226: ... Printed 603 95 747 Base 12 2013 ...