10
EUROCARGO Euro 6
–
CHASSIS INTERVENTIONS
CHASSIS INTERVENTIONS
2.2
DRILLS ON THE CHASSIS
–
Printed 603.95.747
–
1st Ed. - Base 12/2013
Weld operations
●
Thoroughly remove paint and rust from the chassis where welds will be made, as well as all parts that will be covered by rein-
forcements.
●
Cut the side members with a skewed or vertical cut. The side members must not be cut at the points where the chassis con-
tour and width changes or where stress is greater (e.g. spring mounts). The cutting line must not go through the holes on the
side member (see Figure 2.4).
91446
Figure 4
●
Make a 60 degree bevel cut on the internal part of the side member of the parts to join, for the entire length of the weld area
(see Figure 2.5).
91447
Figure 5
●
Arc weld the area with multiple steps and use base electrodes that are thoroughly dried.
Avoid power overloads; the welds must be free of marginal incisions and slag.
●
Start from the opposite end and weld as in the previous item.
●
Let the side members cool slowly and in a uniform fashion. No cooling with air jets, water or other means is allowed.
●
Grind off the excess material.
●
Mount steel corner reinforcements that have the same characteristics as the chassis; the minimum indicative sizes are shown in
Figure 2.3.
Reinforcement anchorage must regard only the vertical rib of the side member and can be realised with a weld bead, staples,
bolts or nails (even Huck nails).
Area and length of the weld bead, number and distribution of staples, number of nails of bolts must be adequate to transmit
the bending and shearing moments.
●
Once work is complete, use anti-rust protection (see Paragraph"Added or Modified Parts" (
➠
Page 13)).
Содержание EUROCARGO
Страница 1: ...EUROCARGO EURO 6 M E D I U M R A N G E BODYBUILDERS INSTRUCTIONS ISSUE 2013 ...
Страница 4: ... Printed 603 95 747 Base 12 2013 ...
Страница 6: ... Printed 603 95 747 Base 12 2013 ...
Страница 8: ... Printed 603 95 747 Base 12 2013 ...
Страница 9: ... Printed 603 95 747 Base 12 2013 SECTION 1 GENERAL INFORMATION ...
Страница 10: ... Printed 603 95 747 Base 12 2013 ...
Страница 12: ...4 EUROCARGO Euro 6 GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 747 1st Ed Base 12 2013 ...
Страница 28: ...20 EUROCARGO Euro 6 GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 747 1st Ed Base 12 2013 ...
Страница 29: ... Printed 603 95 747 Base 12 2013 SECTION 2 CHASSIS INTERVENTIONS ...
Страница 30: ... Printed 603 95 747 Base 12 2013 ...
Страница 91: ... Printed 603 95 747 Base 12 2013 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES ...
Страница 92: ... Printed 603 95 747 Base 12 2013 ...
Страница 135: ... Printed 603 95 747 Base 12 2013 SECTION 4 POWER TAKE OFFS ...
Страница 136: ... Printed 603 95 747 Base 12 2013 ...
Страница 138: ...4 EUROCARGO Euro 6 POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 747 1st Ed Base 12 2013 ...
Страница 160: ...26 EUROCARGO Euro 6 POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 747 1st Ed Base 12 2013 ...
Страница 161: ... Printed 603 95 747 Base 12 2013 SECTION 5 ELECTRONIC SUB SYSTEMS ...
Страница 162: ... Printed 603 95 747 Base 12 2013 ...
Страница 164: ...4 EUROCARGO Euro 6 ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 747 1st Ed Base 12 2013 ...
Страница 215: ... Printed 603 95 747 Base 12 2013 SECTION 6 SPECIAL INSTRUCTIONS FOR SCR EXHAUST SYSTEM ...
Страница 216: ... Printed 603 95 747 Base 12 2013 ...
Страница 226: ... Printed 603 95 747 Base 12 2013 ...