4 Installation
4.1 Pre-installation
Precautions
WARNING:
•
When installing in a potentially explosive environment, ensure that the motor is properly
certified.
•
All equipment being installed must be properly grounded to prevent unexpected dis-
charge. Discharge can cause equipment damage, electric shock, and result in serious in-
jury. Test the ground lead to verify it is connected correctly.
NOTICE:
•
Electrical connections must be made by certified electricians in compliance with all inter-
national, national, state and local regulations.
•
Supervision by an authorized ITT representative is recommended to ensure proper instal-
lation. Improper installation may result in equipment damage or decreased performance.
Evaluate the installation in order to determine that the Net Positive Suction Head Available (NPSH
A
)
meets or exceeds the Net Positive Suction Head Required (NPSH
R
), as stated by the pump performance
curve.
4.1.1 Pump location guidelines
Guideline
Explanation/comment
Keep the pump as close to the liquid source as
practically possible.
This minimizes the friction loss and keeps the suction piping as
short as possible.
Make sure that the space around the pump is
sufficient.
This facilitates ventilation, inspection, maintenance, and service.
If you require lifting equipment such as a hoist or
tackle, make sure that there is enough space
above the pump.
This makes it easier to properly use the lifting equipment and
safely remove and relocate the components to a safe location.
Protect the unit from weather and water damage
due to rain, flooding, and freezing temperatures.
This is applicable if nothing else is specified.
Do not install and operate the equipment in
closed systems unless the system is constructed
with properly-sized safety devices and control
devices.
Acceptable devices:
•
Pressure relief valves
•
Compression tanks
•
Pressure controls
•
Temperature controls
•
Flow controls
If the system does not include these devices, consult the engineer
or architect in charge before you operate the pump.
Take into consideration the occurrence of un-
wanted noise and vibration.
The best pump location for noise and vibration absorption is on a
concrete floor with subsoil underneath.
4 Installation
Model 3296 EZMAG Installation, Operation, and Maintenance Manual
17