![background image](http://html1.mh-extra.com/html/ip-com/g3224p/g3224p_user-manual_2088190012.webp)
5
LED
Number Color
Status
Description
Solid
Proper connection to power supply
SYS
1
Green
Off
System is functioning improperly.
Solid
System is functioning improperly.
Blinking System is functioning properly.
PoE-MAX
1
Green
Off
Power available for additional PDs
Solid
Reaching max power budget (354.2W) and no
more power available for another new PD
Link/Act 1-24
24
Orange
Off
An invalid link is established.
Solid
A valid link is established.
Blinking Transmitting packets
PoE 1-24
24
Green
Solid
The PoE powered device (PD) is connected and
the port is supplying power successfully.
Off
No PoE-powered device (PD) connected
SFP1-SFP4
4
Green
Solid
Packet transmission or a valid link is
established on the port.
Off
An invalid link is established on the port.
1.4.3 Interfaces
1.4.3.1 Console Interface
This switch, with an RS232 asynchronous console port, can be used for connecting PCs to test, configure, maintain
and manage the system. The console cable is an 8-conductor cable. One end of the console cable, RJ45 plug, is
connected to the Console port on the switch; while the other end, DB9 plug, is connected to 9-conductor console
outlet.
1.4.3.2 Ethernet Interface
(1) Ethernet interface overview
This device has 24 RJ45 10/100/1000M auto negotiating Gigabit Ethernet switching ports and 4 1000M SFP fiber
ports.
Speed and working mode in RJ45 port mode:
Speed
Working Mode
10Mbps (auto-negotiation)
Half/Full duplex auto-negotiation
100Mbps (auto-negotiation)
Half/Full duplex auto-negotiation
1000Mbps (auto-negotiation)
Full duplex auto-negotiation
Содержание G3224P
Страница 1: ......