Chapter 2: Installation
42
FlexZone™ Product Guide
3
T1 - tamper input
11
T9 (terminals 4, 5, 6) - B Side sensor
cable input (4 & 6 = shield, 5 = center
conductor)
4
SD Active LED
12
T4 - power input (- +) 12 to 48 VDC
5
SD record button (ON/OFF)
13
T7 - Auxiliary inputs (self-test/auxiliary
device inputs) AUX 1 - +, AUX 2 - +
6
microSD card slot
14
Relay activity LEDs (X4) - LED ON =
relay active
7
T3 - USB connection to UCM PC
15
Tamper switch - open = tamper alarm
8
UCM activity LEDs (TX, RX)
16
T2 - Expansion header for network
interface card
Cable entry ports
The bottom of the FlexZone enclosure includes five cable entry ports fitted with
compression glands for the sensor cables, power cable, and alarm data cables.
The central port includes a 12.7 mm cable gland, which fits cables ranging
between 4.3-11.4 mm. The other four ports (two on each side) provide 9.5 mm
compression glands, which fit cables ranging between 2.9-7.9 mm. Five
weatherproof plugs are included for instances where not all of the cable entry
ports are required. The bottom of the enclosure also includes an exterior ground
lug for the earth ground connection.
Figure 49: Cable entry recommendations
Free-standing or fence post mounting the enclosure
• Install the processor near eye-level on the secure side of the perimeter.
• Mount the enclosure with the cable entry ports on the bottom toward the
ground.
• Install an approved earth ground at the processor location, if required (see
"Grounding considerations" on page 15).
• Mounting the enclosure away from the protected fence on the secure side of
the perimeter can help prevent tampering.
A Side cable
B Side cable
earth ground
12 - 48 VDC
aux input/
self-test
relays/data
earth ground
12-48 VDC
auxiliary inputs/self-test
relay outputs
network communications
sensor cable Side B
sensor cable Side A
Содержание FlexZone Series
Страница 1: ...FlexZone Product Guide P N 466 2877 REV C ISS 19MAR19...
Страница 6: ......
Страница 23: ...Chapter 1 System planning FlexZone Product Guide 17 Figure 11 High security redundancy 2 1 km example...
Страница 24: ......
Страница 41: ...Chapter 2 Installation FlexZone Product Guide 35 Figure 40 Mounting the splice enclosure 15 cm...
Страница 61: ...Chapter 2 Installation FlexZone Product Guide 55 Figure 63 UltraWave connection diagrams Silver Network Relay...
Страница 62: ......
Страница 86: ......
Страница 94: ......