Chapter 2: Installation
36
FlexZone™ Product Guide
Sensor cable terminations
See "Cable preparation (all connections)" on page 31 for steps 1 to 6.
7. For terminations bend and form the section of twisted braided shield on the
left side of the cable into a conductor that is parallel with, and separated from,
the center conductor by 5 mm. Trim the second section of twisted braided
shield flush with the black jacket.
8. Trim the twisted braided shield and center conductor to a length of 6 mm past
the clear tube.
Figure 41: Sensor cable terminations steps 7 & 8
9. Insert the center conductor into the right side terminal (+) and tighten the
screw. Insert the twisted braided shield into the left hand terminal (-) and
tighten the screw. Observe polarity.
10. Secure the sensor cable to the termination CCA using the supplied cable ties.
Ensure that the heads of the cable ties are both on the same side of the CCA
and that they are at a 45º angle from the flat plane of the CCA.
Figure 42: Sensor cable terminations steps 9 & 10
11. Line up the termination CCA so it is centered between the dual cable guide
bars, and press the assembly firmly into the gel snap enclosure. Press the
sensor cable into the cable guide bars. DO NOT remove the protective gel
inside the enclosure.
12. Snap the enclosure shut ensuring that both tabs are securely locked in the
slots.
Note:
The weather-proofing protective gel should be oozing out of the gel
snap enclosure.
45º
center conductor
shield
Содержание FlexZone Series
Страница 1: ...FlexZone Product Guide P N 466 2877 REV C ISS 19MAR19...
Страница 6: ......
Страница 23: ...Chapter 1 System planning FlexZone Product Guide 17 Figure 11 High security redundancy 2 1 km example...
Страница 24: ......
Страница 41: ...Chapter 2 Installation FlexZone Product Guide 35 Figure 40 Mounting the splice enclosure 15 cm...
Страница 61: ...Chapter 2 Installation FlexZone Product Guide 55 Figure 63 UltraWave connection diagrams Silver Network Relay...
Страница 62: ......
Страница 86: ......
Страница 94: ......