6.2 Start-up
Once a general visual inspection, wiring check and sealing check has been carried out, proceed to connect power
to the unit while keeping it switched off, following the guidelines in the instruction manual for the unit installed.
The tasks outlined for this step must be carried out with the unit door always closed, thus avoiding possible contact
with live parts without IP6X protection.
6.2.1 Adjustments
Change date
Go to the CHANGE DATE menu.
Adjust the date and time of the unit’s internal clock.
The section on ‘Display control’ explains how to do this.
Check that the monitored variables have coherent values using the keyboard and flat screen.