Terminal Installation: Wall Preparation
14
GT-400 Terminal User’s Guide
3
Hang the wall plate from the leveling
hole located near the top of the wall
plate.
4
Use a bubble level to ensure that the
wall plate is level.
5
Mark the locations of the two upper
mounting holes and the two lower
mounting holes.
For a concealed wiring connection
through the wall, mark the rear
cable entry hole on the wall plate.
Figure 3.6— Leveling the Terminal, Step Two
Figure 3.7— Leveling the Terminal, Step Two
Upper
Mounting Holes
Lower
Mounting Holes
Cable
Entry Hole
Содержание Schlage AMGtime G Series
Страница 1: ...GT 400 Terminal User s Guide...
Страница 8: ...Table of Contents vi GT 400 Terminal User s Guide...
Страница 14: ...Introduction Using This Guide 6 GT 400 Terminal User s Guide...
Страница 50: ...Basic Operations Rebooting the Terminal 42 GT 400 Terminal User s Guide...
Страница 114: ...Tips and Tricks 106 GT 400 Terminal User s Guide...
Страница 118: ...Index 110 GT 400 Terminal User s Guide...