13
GT-400 Terminal User’s Guide
Terminal Installation: Wall Preparation
Wall Preparation
These directions and provided hardware are for installation on a hollow wall only. For installation
on a solid wall, other means should be used.
1
Measure and mark a point 49 inches
(124.5 cm) from the surface of the
finished floor.
This point is used by the leveling
hole where the top-center point of
the terminal should be mounted.
At 49 inches, the unit’s platen will
be 40 inches from the floor.
2
Drive a small nail into the wall at the
mark.
For a solid wall, pre-drill a 1/8” hole.
Insert nail into the hole.
Figure 3.4— Measurements for Terminal Installation
Finished Floor
49 inches
(124.5 cm)
Leveling
Hole
Figure 3.5— Leveling the Terminal, Step One
Содержание Schlage AMGtime G Series
Страница 1: ...GT 400 Terminal User s Guide...
Страница 8: ...Table of Contents vi GT 400 Terminal User s Guide...
Страница 14: ...Introduction Using This Guide 6 GT 400 Terminal User s Guide...
Страница 50: ...Basic Operations Rebooting the Terminal 42 GT 400 Terminal User s Guide...
Страница 114: ...Tips and Tricks 106 GT 400 Terminal User s Guide...
Страница 118: ...Index 110 GT 400 Terminal User s Guide...