Everest XCR - Product Manual |
Installation
INGENIA | 08/04/2019
18
6.1.3. Rework
Rework that requires removing the Everest from the plate should be done carefully:
1. Remove the 4 M2.5 screws.
2. Separe the Everest from the heatsink by prying, torquing or peeling. Make sure the forces are applied to the
Everest enclosure and not to the PCB or connectors.
3. The thermal tape will be destroyed upon separation and must be replaced. The surfaces should be re-
cleaned according to the recommendations mentioned above. Do not try to reuse the thermal tape.
4. Heating the substrates can reduce the adhesion level and make removal easier