Page 29
INE SpA
Via Facca, 10 - 35013 Cittadella - PADOVA - ITALIA Tel. 049/9481111 - Fax 049/9400249 - [email protected] - www.ine.it
•
Duty cycle:
balance between welding current timing
and base current timing (e.g., a 50% duty cycle
means that welding current timing equals the base
current timing, a 30% duty cycle means that the
welding current timing is lower than the base current
timing).
•
Start current:
value of initial current or first level (in
Amperes or %).
•
Final current:
value of end current or third level (in
Amperes or %).
•
Start time:
duration of initial current or first level
(only for 2-level mode and advanced 2-stroke).
•
Final time:
duration of end current or third level (only
for 2-level mode and advanced 2-stroke).
•
Current 2:
second level current value (in Amperes or
%); only for 2-level mode.
•
Welding time (SPOT):
duration of a welding cycle.
•
Tack:
duration of initial pulse to start bonding the
pieces, starting from the outer edge without too
much deformation (available only in TIG DC).
•
Maximum current of remote control:
allows to set
the maximum value of the current for the remote
control.
H
SI
L
G
N
E
Содержание SKYLINE HFP3000
Страница 96: ......