12. RECOMMENDED MAINTENANCE EVERY 3-6 MONTHS
(Period is subject to filmprocessor useage.)
Good processing quality and the reliable operation of a filmprocessor is dependent upon regular
and careful cleaning. Every 3-6 months, the chemicals in the tanks should be drained.
A chemical cleaning of the processing tanks and wash tank is recommended. Always follow
safety warnings as described in section 1 when cleaning the filmprocessor.
Prior to
carrying out any maintenance
, switch off the power at the main power switch
(position "0") ensuring it cannot be accidently switched back on.
*)
Switch off the main power switch of the film processor first (position „0“).
*)
Remove the top cover of the filmprocessor.
*)
Drain individual tanks by open the draintaps in front of the filmprocessor.
*)
Remove rack assemblies (water / DEV / FIX, see item 2.1) and put them aside.
*)
Close taps and fill all tanks with water or better with suitable cleaning solution
until the red mark inside the tanks are reached.
*)
Put the racks back into the tanks of the filmprocessor and close the top cover.
*)
Switch on the filmprocessor and start some replenishment cycles. The hoses will be
cleaned with water as well. Also start the transport of the filmprocessor, the racks has to be
in. Let the filmprocessor run for 10 to 15 minutes.
*)
Switch off („0“ position)the main power switch of the filmprocessor and drain the
filmprocessor tanks again.
*)
NOTE: Use cleaning solution according to the manufacturer´s instructions.
*)
After tank cleaning, the developer- and wash-tank should be filled twice with fresh water
(eventually use neutralizer recommended by manufacturer). Let the filmprocessor run for
approximately 10 minutes again. Check all external (outside of the filmprocessor)
hose connectors (outside of filmprocessor) and fittings for leaks.
*)
Drain all tanks.
*)
Remove the water / DEV / FIX Racks and check for:
-worn gears
-damaged or worn bearings
-loose screws
-scratched or bent film guides
-plastic flat springs in developer bottom underturn.
*)
All repairs must be carried out by qualified service personnel.
*)
Check the inside of the tank for contamination and alien substances.
*)
Clean the rollers well.
*)
Close the drain taps of all 3 tanks.
*)
Fill developer and fixer tanks with fresh chemicals to the required level (1st fixer, 2nd
developer)
*)
Fill wash tank.
*)
Re-install the racks carefully. Take care of correct sequence of the racks is followed and
make sure the gears are in the right position. Secure the racks.
*)
Insert the respective suction pipe to the correct external replenisher tank.
Re-install the top cover and switch on the filmprocessor.
*)
Process test films.
Содержание M43ic
Страница 1: ...INSTRUCTION MANUAL 04 2011 TK NDT FILM PROCESSOR Industrex M43ic M43icN AT800 v2 8r09p and up ...
Страница 3: ...Input speed DEV time Cycle time KODAKIndustrexM43ic Industrex M43ic M43icN ...
Страница 49: ...page 43 01 2013 TK Industrex M43ic M43icN NOTES ...
Страница 50: ...page 44 01 2013 TK Industrex M43ic M43icN NOTES ...
Страница 51: ...page 45 01 2013 TK Industrex M43ic M43icN NOTES ...