iii
Table of Contents
1.
MPC
V
ECTOR
O
PERATION
................................................................................................................... 1
1.1
MPC VECTOR Standard Features ......................................................................................... 1
1.2
Description .............................................................................................................................. 1
1.2.1
System Input/Output Power Ratings ................................................................................ 2
1.2.2
Handheld User Interface Operation .................................................................................. 3
1.2.3
System Modes ..................................................................................................................... 4
1.2.4
Normal System Operational Modes .................................................................................. 5
1.2.5
Control Modes ..................................................................................................................... 6
2.
S
AFETY
C
ONSIDERATIONS
.................................................................................................................... 9
2.1
General Safety ......................................................................................................................... 9
2.2
Electrical Safety ...................................................................................................................... 9
2.3
Mechanical Safety ................................................................................................................... 9
2.4
Hydraulic Safety ...................................................................................................................... 9
3.
E
QUIPMENT
I
NSPECTION
....................................................................................................................... 10
4.
S
TORAGE
I
NSTRUCTIONS
...................................................................................................................... 10
4.1
Short Term (0 - 12 months) .................................................................................................... 10
4.2
Long Term (12 months or more) ........................................................................................... 10
5.
I
NSTALLATION AND
W
IRING
.................................................................................................................. 11
5.1
Installation Notes .................................................................................................................... 11
5.2
Controller Location ................................................................................................................. 11
5.2.1
Controller Mounting and Layout ....................................................................................... 12
5.2.2
NEMA 4X Version ................................................................................................................ 12
5.2.3
OPEN CHASSIS Panel Mount Version .............................................................................. 14
5.3
Electrical Wiring ...................................................................................................................... 15
5.3.1
Pump Motor Wiring ............................................................................................................. 17
5.3.2
AC Line Input Wiring .......................................................................................................... 17
5.3.3
Control Input/Output Signal Wiring .................................................................................. 23
5.4
Check Wiring and Close Access Cover ................................................................................ 27
6.
S
YSTEM
C
ONFIGURATION
..................................................................................................................... 27
6.1
Overview .................................................................................................................................. 27
6.2
Critical System Configuration Steps .................................................................................... 27
6.3
Confirm Display and Keypad Functionality ......................................................................... 29
6.4
Motor Parameter Setup .......................................................................................................... 30
6.5
Flow Display and Units .......................................................................................................... 30
6.6
Setting Max Flow and Max Speed ......................................................................................... 30
6.7
Wrapping up ............................................................................................................................ 32
6.8
Factory Re-Initialization ......................................................................................................... 33
7.
I
NPUT
/O
UTPUT
S
ETUP
.......................................................................................................................... 34
7.1
Analog Input Setup ................................................................................................................. 34
7.1.1
Analog Input 1 – Set point ................................................................................................. 34
7.1.2
Analog Input 2 – Flow meter Feedback ............................................................................ 34
7.1.3
Analog Input Testing .......................................................................................................... 34
7.2
Digital Input Setup .................................................................................................................. 35
7.2.1
Multi-purpose Digital Inputs .............................................................................................. 35
7.2.2
Testing Digital Inputs ......................................................................................................... 35
7.3
Analog Output Setup .............................................................................................................. 36
7.4
Digital Output Setup ............................................................................................................... 36
7.4.1
Multi-purpose Digital Outputs ........................................................................................... 36
7.4.2
Testing Digital Outputs ...................................................................................................... 36
8.
C
ALIBRATIONS
..................................................................................................................................... 38
8.1
Pump Flow Calibration ........................................................................................................... 38
8.1.1
Open Loop Pump Flow Calibration ................................................................................... 38
8.1.2
Closed Loop Pump Flow Scaling and Calibration ........................................................... 42
8.1.3
Set point Calibration and Range Setup ............................................................................ 46
Содержание Pulsafeeder MPC Vector
Страница 6: ......
Страница 14: ...8 Figure 1 3 Closed Loop Control Feedback Block Diagram Figure 1 4 Closed Loop Flow Calibration Curve...
Страница 43: ...37 This page is intentionally left blank...
Страница 73: ...67 Continues next page...
Страница 80: ...74 16 Menu Maps...
Страница 81: ...75...
Страница 82: ...76...
Страница 83: ...77...
Страница 84: ...78...
Страница 85: ...79...
Страница 86: ...80...
Страница 87: ...81...
Страница 88: ...82...
Страница 89: ...83...
Страница 90: ...84...
Страница 91: ...85...
Страница 92: ...86...
Страница 93: ...87...
Страница 94: ...88...
Страница 95: ...89...
Страница 96: ...90...
Страница 97: ...91...
Страница 105: ...99 Figure 8 Handheld Remote...
Страница 112: ......
Страница 113: ......
Страница 114: ...and Keypad Functionality BULLETIN No IOM MPCVector UMPC 11 201010 Rv A...