16
ICC
4.2
Maintenance Precautions
•
Do Not
attempt to disassemble, modify, or repair the gateway.
Contact your ICC sales representative for repair or service
information.
•
If the gateway should emit smoke or an unusual odor or sound,
turn the power off immediately.
•
The system should be inspected periodically for damaged or
improperly functioning parts, cleanliness, and to determine that
all connectors are tightened securely.
4.3
Inspection
Upon receipt, perform the following checks:
•
Inspect the unit for shipping damage.
•
Check for loose, broken, damaged or missing parts.
Report any discrepancies to your ICC sales representative.
4.4
Maintenance and Inspection Procedure
Preventive maintenance and inspection is required to maintain the gateway in its
optimal condition, and to ensure a long operational lifetime. Depending on usage
and operating conditions, perform a periodic inspection once every three to six
months.
Inspection Points
•
Check that there are no defects in any attached wire terminal crimp points.
Visually check that the crimp points are not scarred by overheating.
•
Visually check all wiring and cables for damage. Replace as necessary.
•
Clean off any accumulated dust and dirt.
•
If use of the interface is discontinued for extended periods of time, apply
power at least once every two years and confirm that the unit still functions
properly.
•
Do not perform hi-pot tests on the interface, as they may damage the unit.
Please pay close attention to all periodic inspection points and maintain a good
operating environment.
Содержание ETH-1000
Страница 44: ...43 ICC 8 7 4 BBMD Currently the BBMD is only configurable via the embedded web page Refer to section 10 11...
Страница 60: ...59 ICC Figure 10 MELSEC Client Concept...
Страница 158: ...157 ICC Figure 22 Core FTP in Connected State...
Страница 208: ...207 ICC SMin SMax Min Max multiplier Equation 1 SMin offset Equation 2...
Страница 278: ...277 ICC Figure 114 BACnet Modbus Binary Objects Discretes Big Endian...