76
IBM z13s Technical Guide
CBU for CP rules
Consider the following guidelines when planning for CBU for CP capacity:
The total CBU CP capacity features are equal to the number of added CPs plus the
number of permanent CPs changing capacity level. For example, if two CBU CPs are
added to the current model D03, and the capacity level does not change, the D03
becomes D05:
(D03 + 2 = D05)
.
If the capacity level changes to an E06, the numbers of additional CPs (3) are added to the
three CPs of the D03, resulting in a total number of CBU CP capacity features of six:
(3 + 3 = 6)
.
The CBU cannot decrease the number of CPs.
The CBU cannot lower the capacity setting.
CBU for specialty engines
Specialty engines (ICFs, IFLs, and zIIPs) run at full capacity for all capacity settings. This
characteristic also applies to CBU for specialty engines. Table 2-13 shows the minimum and
maximum (min-max) numbers of all types of CBUs that can be activated on each of the
models. The CBU record can contain larger numbers of CBUs than can fit in the current
model.
Table 2-13 Capacity Backup matrix
2.7.6 On/Off Capacity on Demand and CPs
On/Off CoD provides temporary capacity for all types of characterized PUs. Relative to
granular capacity, On/Off CoD for CPs is treated similarly to the way CBU is handled.
On/Off CoD and granular capacity
When temporary capacity requested by On/Off CoD for CPs matches the model capacity
identifier range of the permanent CP feature, the total number of active CP equals the sum of
the number of permanent CPs plus the number of temporary CPs ordered. For example,
when a model capacity identifier D03 has two CPs added temporarily, it becomes a model
capacity identifier D05.
When the addition of temporary capacity requested by On/Off CoD for CPs results in a
cross-over from one capacity identifier range to another, the total number of CPs active when
the temporary CPs are activated is equal to the number of temporary CPs ordered. For
example, when a configuration with model capacity identifier D03 specifies four temporary
CPs through On/Off CoD, the result is a server with model capacity identifier E05.
On/Off Capacity on Demand: Activation of CBU for CPs, IFLs, ICFs, zIIPs, and SAPs can
be activated together with On/Off Capacity on Demand (CoD) temporary upgrades. Both
facilities can be implemented on one system, and can be activated simultaneously.
Model
Total
PUs
available
CBU
CPs
min -
max
CBU
IFLs
min -
max
CBU
ICFs
min -
max
CBU
zIIPs
min -
max
CBU
SAPs
min -
max
Model N10
13
0 - 6
0 - 10
0 - 10
0 - 6
0 - 2
Model N20
26
0 - 6
0 - 20
0 - 20
0 - 12
0 - 3
Содержание z13s
Страница 2: ......
Страница 3: ...International Technical Support Organization IBM z13s Technical Guide June 2016 SG24 8294 00 ...
Страница 24: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 164: ...136 IBM z13s Technical Guide ...
Страница 226: ...198 IBM z13s Technical Guide ...
Страница 256: ...228 IBM z13s Technical Guide ...
Страница 414: ...386 IBM z13s Technical Guide ...
Страница 464: ...436 IBM z13s Technical Guide ...
Страница 476: ...448 IBM z13s Technical Guide ...
Страница 498: ...470 IBM z13s Technical Guide ...
Страница 502: ...474 IBM z13s Technical Guide ...
Страница 568: ...540 IBM z13s Technical Guide ...
Страница 578: ...550 IBM z13s Technical Guide ...
Страница 584: ...556 IBM z13s Technical Guide ...
Страница 585: ...ISBN 0738441678 SG24 8294 00 1 0 spine 0 875 1 498 460 788 pages IBM z13s Technical Guide ...
Страница 586: ......
Страница 587: ......
Страница 588: ...ibm com redbooks Printed in U S A Back cover ISBN 0738441678 SG24 8294 00 ...