Figure 17. Connecting the power cords
3. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/
POWER9/p9haj/crustartsys.htm).
4. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm).
Related procedures for installing, removing, and replacing NVMe
devices
About this task
Find procedures that are related to installing, removing, and replacing NVMe devices.
Checking the amount of remaining life in NVMe devices
Learn how to use operating system commands to find the amount of remaining life in an NVMe device.
The AIX, IBM i, and Linux operating systems have commands that you can use to determine the amount of
life that is remaining in an NVMe device.
For more information, see the following procedures:
28 Power Systems: NVMe U.2 drives for the 9040-MR9
Содержание Power System System E950
Страница 1: ...Power Systems NVMe U 2 drives for the 9040 MR9 IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems NVMe U 2 drives for the 9040 MR9...
Страница 18: ...or or or or 4 Power Systems NVMe U 2 drives for the 9040 MR9...
Страница 26: ...Figure 9 Removing the power cords L003 or or 12 Power Systems NVMe U 2 drives for the 9040 MR9...
Страница 44: ...30 Power Systems NVMe U 2 drives for the 9040 MR9...
Страница 55: ......
Страница 56: ...IBM...