Figure 16. Installing an NVMe drive filler in the 9040-MR9 system
Preparing the 9040-MR9 system for operation after permanently removing
an NVMe U.2 drive
To prepare the system for operation after permanently removing an NVMe U.2 drive, complete the steps in
this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Using your labels, reconnect the power cords (A) to the system unit as shown in the following figure.
Fasten the power cords to the system by using the hook-and-loop fasteners (B) as shown in the
following figure.
NVMe U.2 drives for the 9040-MR9 27
Содержание Power System System E950
Страница 1: ...Power Systems NVMe U 2 drives for the 9040 MR9 IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems NVMe U 2 drives for the 9040 MR9...
Страница 18: ...or or or or 4 Power Systems NVMe U 2 drives for the 9040 MR9...
Страница 26: ...Figure 9 Removing the power cords L003 or or 12 Power Systems NVMe U 2 drives for the 9040 MR9...
Страница 44: ...30 Power Systems NVMe U 2 drives for the 9040 MR9...
Страница 55: ......
Страница 56: ...IBM...