Note:
Stage
2
frames
(FC
9309)
have
a
Rack
Attention
light
on
the
frame
control
panel.
v
Yes
:
Continue
with
the
next
step.
v
No
:
Go
to
step
22
(See
page
.
3.
Starting
from
J15
or
J16
on
the
system
unit,
go
to
the
first
frame
in
the
frame
interconnect
cable
sequence
on
which
one
of
the
following
conditions
is
present:
v
The
Power
Ready
light
is
off.
v
The
Power
Ready
light
is
blinking.
v
A
frame-mounted
unit
displays
a
power
reference
code
of
1xxx
xx2E.
Is
the
Power
Ready
light
blinking?
v
No
:
Continue
with
the
next
step.
v
Yes
:
A
normal
power-on
sequence
may
be
in
process.
If
any
Power
Ready
light
is
blinking
for
more
than
1
minute,
exchange
the
power
control
compartment
(PCC)
on
the
frame
with
the
blinking
light.
Note:
See
the
topic,
or
the
FC
504x
Problem
Analysis
and
Repair
and
Parts
information
(SY44-4934-00),
or
the
manual
on
the
V5R1
Supplemental
Manuals
web
site
,
depending
on
the
secondary
frame
you
are
working
on.
This
ends
the
procedure.
4.
Is
the
Attention
light
on
or
blinking?
v
No
:
Continue
with
the
next
step.
v
Yes
:
Go
to
step
15
(See
page
.
5.
Does
a
frame-mounted
unit
display
a
power
reference
code
of
1xxx
xx2E?
44
iSeries:
iSeries
Server
270,
800,
810,
820,
825,
830,
840,
870,
890,
SB2,
and
SB3
Hardware
Problem
Analysis
and
Isolation
Содержание iSeries Series
Страница 2: ......
Страница 504: ...492 iSeries iSeries Server 270 800 810 820 825 830 840 870 890 SB2 and SB3 Hardware Problem Analysis and Isolation...
Страница 508: ...496 iSeries iSeries Server 270 800 810 820 825 830 840 870 890 SB2 and SB3 Hardware Problem Analysis and Isolation...
Страница 511: ......
Страница 512: ...Printed in USA SY44 5914 01...