11.
To put the cable management bracket in the operating position, complete the following steps:
a.
Pull the quarter-turn fasteners (B) out and turn them to disengage them while moving the cable
management bracket (A) to its lower position (2). See Figure 13 on page 16.
b.
Turn the quarter-turn fasteners (B) to engage and lock the bracket into position.
Figure 12. Placing the cable management bracket in the service position
Installing an EMX0 PCIe Gen3 I/O expansion drawer
15
Содержание EMX0 PCIe3
Страница 1: ...Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer GI11 9914 04 IBM...
Страница 2: ......
Страница 3: ...Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer GI11 9914 04 IBM...
Страница 6: ...iv Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 16: ...xiv Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 58: ...42 Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 70: ...54 Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 71: ......
Страница 72: ...IBM Part Number 01LK530 Printed in USA GI11 9914 04 1P P N 01LK530...