9.
Attach the cable management bracket to the rack by completing the following steps:
a.
At the rear of the rack, partially tighten two M5 screws (A) directly above the drawer rail clamps
where nut clips are installed. These two screws become the bottom screws that support the cable
management bracket against the rack. See Figure 11 on page 14.
b.
Place the bottom of the mounting flanges on the cable management bracket (B) over the two M5
screws to support the bracket flanges against the rack.
c.
Align the bracket so that its mounting flanges (B) align with the top holes in the rack flanges, as
shown in Figure 11 on page 14.
d.
Completely tighten the top two M5 screws (C) above the rail clamp where nut clips are installed.
e.
Finish tightening the bottom two M5 screws (A).
P8EGP504-0
M
L
N
Figure 10. Installing the cover and service information card
Installing an EMX0 PCIe Gen3 I/O expansion drawer
13
Содержание EMX0 PCIe3
Страница 1: ...Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer GI11 9914 04 IBM...
Страница 2: ......
Страница 3: ...Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer GI11 9914 04 IBM...
Страница 6: ...iv Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 16: ...xiv Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 58: ...42 Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 70: ...54 Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 71: ......
Страница 72: ...IBM Part Number 01LK530 Printed in USA GI11 9914 04 1P P N 01LK530...