The system that supplies the cooling water must be able to measure the room dew point and
automatically adjust the water temperature accordingly. Otherwise, the water temperature must be
above the maximum dew point for that data center installation. For example, the following minimum
water temperature must be maintained:
• 18°C plus or minus 1°C (64.4°F plus or minus 1.8°F). This specification is applicable within an
ASHRAE Class 1 Environmental Specification that requires a maximum dew point of 17°C (62.6°F).
• 22°C plus or minus 1°C (71.6°F plus or minus 1.8°F). This specification is applicable within an
ASHRAE Class 2 Environmental Specification that requires a maximum dew point of 21°C (69.8°F).
See the ASHRAE document Thermal Guidelines for Data Processing Environments.
Pressure:
The water pressure in the secondary loop must be less than 690 kPa (100 psi). Normal operating
pressure at the heat exchanger must be 414 kPa (60 psi) or less.
Flow rate:
The flow rate of the water in the system must be in the range of 23 - 57 liters (6 - 15 gallons) per
minute.
Pressure drop versus flow rate for heat exchangers (including quick-connect couplings) is defined as
approximately 103 kPa (15 psi) at 57 liters (15 gallons) per minute.
Water volume limits:
The heat exchanger holds approximately 9 liters (2.4 gallons). Fifteen meters (50 ft) of 19 mm (0.75
in.) supply and return hoses hold approximately 9.4 liters (2.5 gallons). To minimize exposure to
flooding in the case of leaks, the entire product cooling system (heat exchanger, supply hose, and
return hose), excluding any reservoir tank, must have a maximum 18.4 liters (4.8 gallons) of water.
This is a cautionary statement, not a functional requirement. Also, consider using leak detection
methods on the secondary loop that supplies water to the heat exchanger.
Air exposure:
The secondary cooling loop is a closed loop, with no continuous exposure to room air. After you fill the
loop, remove all air from the loop. An air bleed valve is provided at the top of a heat exchanger
manifold for purging all air from the system.
Water delivery specifications for secondary loops
Learn about the various hardware components that make up the delivery system secondary loop that
provides the chilled, conditioned water to the heat exchanger. The delivery system includes pipes, hoses,
and the required connection hardware to connect the hoses to the heat exchanger. Hose management
can be used in raised-floor and non-raised-floor environments.
The heat exchanger can remove 100% or more of the heat load from an individual rack when it is running
under optimum conditions.
The primary cooling loop is considered to be the building chilled-water supply or a modular chiller unit.
The primary loop must not be used as a direct source of coolant for the heat exchanger.
Procurement and installation of the components that are needed to create the secondary cooling loop
system are required for this design and are your responsibility. The main purpose is to provide examples
of typical methods of secondary loop setup and operating characteristics that are needed to provide an
adequate and safe supply of water to the heat exchanger.
Attention:
The overpressure safety device must meet the following requirements:
• Comply with ISO 4126-1.
• Be installed so that it is easily accessed for inspection, maintenance, and repair.
• Be connected as close as possible to the device that it is intended to protect.
62 Power Systems: Site and hardware planning
Содержание 9008-22L
Страница 1: ...Power Systems Site and hardware planning IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems Site and hardware planning...
Страница 16: ...2 Power Systems Site and hardware planning...
Страница 20: ...6 Power Systems Site and hardware planning...
Страница 40: ...Figure 1 FC EPB8 power distribution panel 26 Power Systems Site and hardware planning...
Страница 49: ...Figure 5 FC ERG0 rear rack extender top down view Site and hardware planning 35...
Страница 123: ...Figure 35 Cable management bridge lances Site and hardware planning 109...
Страница 163: ......
Страница 164: ...IBM...