Figure 57. Mode 1 connection of two ESLL or ESLS storage enclosures by using YO12 cables to one pair
of SAS adapters
5. Two independent SAS adapters to one ESLL or ESLS storage enclosure by using a mode 2 connection.
• Connection by using two SAS YO12 cables to connect to the ESLL or ESLS storage enclosure.
Site and hardware planning 135
Содержание 9008-22L
Страница 1: ...Power Systems Site and hardware planning IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems Site and hardware planning...
Страница 16: ...2 Power Systems Site and hardware planning...
Страница 20: ...6 Power Systems Site and hardware planning...
Страница 40: ...Figure 1 FC EPB8 power distribution panel 26 Power Systems Site and hardware planning...
Страница 49: ...Figure 5 FC ERG0 rear rack extender top down view Site and hardware planning 35...
Страница 123: ...Figure 35 Cable management bridge lances Site and hardware planning 109...
Страница 163: ......
Страница 164: ...IBM...