![IBM 9008-22L Скачать руководство пользователя страница 117](http://html1.mh-extra.com/html/ibm/9008-22l/9008-22l_site-and-hardware-planning_3427298117.webp)
Figure 34. HVDC PDU
The rating of the HVDC PDU is 240 - 380 V dc, 90 A. The HVDC PDU has a permanently attached 4.3 m (14
ft) power cord and is unterminated (no plug). The minimum cross-sectional area of the two conductors
and grounding conductor is 16 AWG (1.3 mm).
This PDU has six customer-usable Rong Feng RF-203P outlets that are rated at 240 - 380 V dc. Each
outlet is rated up to 10 A and is fed from one 20 A circuit breaker derated to 16 A. The HVDC PDU does
not have the nationally recognized test laboratory certification that is required for use in North America.
This PDU can be either vertically mounted in the rack side pockets or horizontally mounted by using
feature code (FC) EBA5 (mounting kit). If horizontally mounted, the PDU uses 1U of rack space.
Intelligent Switched PDU
Table 94. Intelligent Switched PDU features
Feature code (FC)
Description
• Voltage
• Amperage
• Phase
Provided power
receptacles
Supported power cords
(PDU to wall)
EPTG (Base)
• 200 - 240 V ac
• Single phase or three
phase
1
• 16 A, 24 A, 32 A, 48 A,
or 63 A
1
9 IEC 320-C19 and 3 IEC
320-C13 receptacles
EPTJ (Additional)
EPTK (Base)
• 208 V ac
• 60 A
• Three-phase
9 IEC 320-C19 and 3 IEC
320-C13 receptacles
Not applicable - fixed IEC
60309, 60 A, plug (3P+G)
power cord
EPTL (Additional)
EPTM (Base)
• 200 - 240 V ac
• Single phase or three
phase
1
• 16 A, 24 A, 32 A, 48 A,
or 63 A
1
Twelve IEC 320-C13
receptacles
EPTN (Additional)
Site and hardware planning 103
Содержание 9008-22L
Страница 1: ...Power Systems Site and hardware planning IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems Site and hardware planning...
Страница 16: ...2 Power Systems Site and hardware planning...
Страница 20: ...6 Power Systems Site and hardware planning...
Страница 40: ...Figure 1 FC EPB8 power distribution panel 26 Power Systems Site and hardware planning...
Страница 49: ...Figure 5 FC ERG0 rear rack extender top down view Site and hardware planning 35...
Страница 123: ...Figure 35 Cable management bridge lances Site and hardware planning 109...
Страница 163: ......
Страница 164: ...IBM...