7028 Models 6C1 and 6E1
The Model 6C1 is a rack-mounted server system and the Model 6E1 is a deskside tower system.
Dimensions
Rack (Model 6C1)
Tower (Model 6E1)
Height
215 mm (8.5 in.)
426 mm (16.8 in.)
5 EIA Units
Width
426 mm (16.8 in.)
215 mm (8.5 in.)
Depth
617 mm (24 in.)
617 mm (24 in.)
Weight
Minimum configuration
35.5 kg 78 lbs.
Maximum configuration
43.1 kg 94.8 lbs.
Electrical
Power source loading (maximum in
kVA)
0.40
Power source loading (typical in kVA)
0.30
Voltage range (V ac)
100 to 127 or 200 to 240 (autoranging)
Frequency (hertz)
50 / 60
Voltage range (V dc)
Not supported
Thermal output (maximum)
1306 Btu/hr
Thermal output (typical)
979 Btu/hr
Power requirements (maximum)
384 watts
Power requirements (typical)
288 watts
Power factor - US, World Trade, Japan
0.96
Inrush current
²
70 amps
Maximum altitude
³
,
⁴
2135 m (7000 ft.)
Temperature Requirements
³
Operating
16 to 32°C
(61 to 90°F)
Non-Operating
10 to 43°C
(50 to 109°F)
Humidity Requirements
⁴
Operating
Non-Operating
(Noncondensing)
8 to 80%
8 to 80%
Wet Bulb
27°C (80°F)
27°C (80°F)
Model 6E1 Noise Emissions
¹
,
⁵
Operating
Idle
L
WAd
6.1 bels
6.1 bels
<L
pA
>
m
42 dBA
41 dBA
Model 6C1 Noise Emissions
¹
,
⁵
Operating
Idle
L
WAd
6.2 bels
5.9 bels
<L
pA
>
m
44 dBA
41 dBA
Install/Air Flow
Maintenance of proper service clearance should allow proper air flow.
Service
See service clearances for the 7014 T00 Rack
4.
2. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
3. The upper limit of the dry bulb temperature must be derated 1 degree C per 137 m (450 ft.) above 915 m (3000
ft.).
4. The upper limit of the wet bulb temperature must be derated 1 degree C per 274 m (900 ft. ) above 305 m (1000
ft.).
5. Levels are for a single system installed in a T00 32 EIA rack with the center of the unit approximately 1500 mm
(59 in.) off the floor.
Chapter 2. Physical Characteristics of Systems
81
Содержание 7012 397
Страница 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 2: ......
Страница 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 11: ...Appendix Notices 385 Index 387 Contents ix...
Страница 12: ...x Site and Hardware Planning Information...
Страница 16: ...xiv Site and Hardware Planning Information...
Страница 18: ...xvi Site and Hardware Planning Information...
Страница 26: ...8 Site and Hardware Planning Information...
Страница 238: ...220 Site and Hardware Planning Information...
Страница 246: ...228 Site and Hardware Planning Information...
Страница 284: ...266 Site and Hardware Planning Information...
Страница 296: ...278 Site and Hardware Planning Information...
Страница 366: ...348 Site and Hardware Planning Information...
Страница 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Страница 374: ...128 Port Async Controller Cable Planning Chart Controller Line Interface 356 Site and Hardware Planning Information...
Страница 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Страница 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Страница 382: ...7318 Serial Communications Network Server Cable Planning Chart 364 Site and Hardware Planning Information...
Страница 384: ...366 Site and Hardware Planning Information...
Страница 402: ...384 Site and Hardware Planning Information...
Страница 404: ...386 Site and Hardware Planning Information...
Страница 413: ......
Страница 414: ...Printed in USA SA38 0508 20...
Страница 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...