Attaching the Rack to a Short or Long Raised Floor:
Attention:
It is the customer’s responsibility to ensure the following steps are completed before the
service representative performs the tie-down procedure.
Note:
To accommodate a floor with a depth of more than 16 inches, a steel beam or a steel channel
adapter for mounting the subfloor eyebolts are required. The customer must supply the floor
eyebolts.
Consider the following when preparing the floor for tie-down:
v
The hardware is designed to support a frame weighing no more than 2636 pounds.
v
The estimated maximum concentrated load on one caster for a 2636 pound-system is 900 pounds. For
a multiple system installation, it is possible that one floor tile will bear a total concentrated load of 1800
pounds.
To install the eyebolts do the following:
1. Obtain the service of a qualified structural engineer to determine appropriate installation of the
eyebolts.
2. Consider the following before installing the eyebolts:
v
Floor eyebolts must be securely anchored to the concrete floor.
v
The minimum height of the center of the internal diameter is 1 inch above the concrete floor surface.
v
The maximum is height 2.5 inches above the concrete floor surface. Higher than 2.5 inches can
cause excessive lateral deflection to the tie-down hardware.
v
The eyebolt’s internal diameter should be 1 3/16 inch, and each eyebolt should be able to withstand
2700 pounds. The customer should obtain the service of a qualified consultant or structural engineer
to determine the appropriate anchoring method for these eyebolts and to ensure that the raised floor
can support the floor-loading specifications.
Chapter 2. Physical Characteristics of Systems
189
Содержание 7012 397
Страница 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 2: ......
Страница 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 11: ...Appendix Notices 385 Index 387 Contents ix...
Страница 12: ...x Site and Hardware Planning Information...
Страница 16: ...xiv Site and Hardware Planning Information...
Страница 18: ...xvi Site and Hardware Planning Information...
Страница 26: ...8 Site and Hardware Planning Information...
Страница 238: ...220 Site and Hardware Planning Information...
Страница 246: ...228 Site and Hardware Planning Information...
Страница 284: ...266 Site and Hardware Planning Information...
Страница 296: ...278 Site and Hardware Planning Information...
Страница 366: ...348 Site and Hardware Planning Information...
Страница 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Страница 374: ...128 Port Async Controller Cable Planning Chart Controller Line Interface 356 Site and Hardware Planning Information...
Страница 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Страница 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Страница 382: ...7318 Serial Communications Network Server Cable Planning Chart 364 Site and Hardware Planning Information...
Страница 384: ...366 Site and Hardware Planning Information...
Страница 402: ...384 Site and Hardware Planning Information...
Страница 404: ...386 Site and Hardware Planning Information...
Страница 413: ......
Страница 414: ...Printed in USA SA38 0508 20...
Страница 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...