7013 Models J30, J40, and J01
Dimensions
J30 & J40
J01
Height
610 mm
24 in.
610 mm
24 in.
Width
360 mm
14.2 in.
360 mm
14.2 in.
Depth
750 mm
29.5 in.
750 mm
29.5 in.
Weight
J30 & J40
J01
Minimum
67 kg
148 lbs.
67 kg
148 lbs.
Maximum
84 kg
185 lbs.
84 kg
185 lbs.
Electrical
J30 & J40
J01
Power source loading
0.9
0.6
(typical in kVA)
Voltage range (V ac)
100 to 125 or 200 to
100 to 125 or 200 to
240 (autoranging)
240 (autoranging)
Frequency (hertz)
50 or 60
50 or 60
Thermal output (typical)
2765 Btu/hr
1843 Btu/hr
Power requirements (typical)
810 watts
540 watts
Power factor
0.8 to 1.0
0.8 to 1.0
Inrush current
³
35 amps at 120 V ac
35 amps at 120 V ac
70 amps at 240 V ac
70 amps at 240 V ac
Maximum altitude
2500 m (8202 ft.)
2500 m (8202 ft.)
Temperature Requirements
Operating
10 to 32°C
(50 to 90°F)
Non-Operating
5 to 50°C
(41 to 122°F)
Humidity (Noncondensing)
Operating
Non-Operating
Without tape drive
8 to 80%
5 to 95%
With tape drive
20 to 80%
20 to 80%
Wet Bulb Requirements
Without tape drive
24°C (75°F)
28°C (82°F)
With tape drive
23°C (73°F)
27°C (80°F)
Noise Emissions
1,4
Operating
Idle
L
WAd
5.8 bels
5.5 bels
L
pAm
N/A
N/A
<L
pA
>
m
NA
NA
Impulsive or prominent discrete
tones
No
No
Clearances
Front
Back
Left
Right
Install/Air Flow
²
500mm(20 in)
500mm(20 in)
500mm(20 in)
500mm(20 in)
Service
500mm(20 in)
N/A
N/A
N/A
Footprint
2
Width
1630mm(64 in)
Depth
1750mm(70 in)
1. See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
2. The amount of space needed by the unit during normal operation is indicated by the footprint dimensions.
3. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
26
Site and Hardware Planning Information
Содержание 7012 397
Страница 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 2: ......
Страница 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 11: ...Appendix Notices 385 Index 387 Contents ix...
Страница 12: ...x Site and Hardware Planning Information...
Страница 16: ...xiv Site and Hardware Planning Information...
Страница 18: ...xvi Site and Hardware Planning Information...
Страница 26: ...8 Site and Hardware Planning Information...
Страница 238: ...220 Site and Hardware Planning Information...
Страница 246: ...228 Site and Hardware Planning Information...
Страница 284: ...266 Site and Hardware Planning Information...
Страница 296: ...278 Site and Hardware Planning Information...
Страница 366: ...348 Site and Hardware Planning Information...
Страница 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Страница 374: ...128 Port Async Controller Cable Planning Chart Controller Line Interface 356 Site and Hardware Planning Information...
Страница 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Страница 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Страница 382: ...7318 Serial Communications Network Server Cable Planning Chart 364 Site and Hardware Planning Information...
Страница 384: ...366 Site and Hardware Planning Information...
Страница 402: ...384 Site and Hardware Planning Information...
Страница 404: ...386 Site and Hardware Planning Information...
Страница 413: ......
Страница 414: ...Printed in USA SA38 0508 20...
Страница 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...