To install the frame, do the following:
Attention:
It is the service representative’s responsibility to complete the following steps.
1.
Before starting the installation, check all cable openings in the floor panel and location of the rubber
bushing holes so that they match the dimensions given in the illustrations on 152.
2.
Power off the system and make sure all cables and connectors are disconnected and are not
dangling around the frame. The frame should be free to roll.
3.
The floor eyebolts should be already secured to the concrete floor. Verify the height of the center of
the floor eyebolt to the concrete floor or the steel beam/channel adapter mounted to the concrete
floor. Ensure that the turnbuckles can accommodate the total height of the raised floor.
4.
Remove the floor tiles around the area where the frame(s) will be installed.
5.
Remove the pin and the spacer from the lower jaw (see the following illustrations).
1
Frame
8
Floor Eyebolt (customer-supplied)
2
Jam Nut
9
Threaded Rod
3
Rack Leveler
10
Nut
4
Rubber Bushing
11
Washer
5
Turnbuckle (Short or Long)
12
Spacer
6
Lower Jaw
13
Shaft
7
Pin
Note:
The difference between the two turnbuckle assemblies is the length of the turnbuckle.
The Short Turnbuckle Assembly (part number 11P4755) is used for a 9 1/2 inches to 11 3/4
inches raised floor.
The Long Turnbuckle Assembly (part number 11P4756) is used for an 11 3/4 inches to 16
inches raised floor.
6.
Place the spacer inside the floor eyebolt and place the floor eyebolt between the lower jaw. Reinstall
the shaft, pin, and spacer.
Chapter 2. Physical Characteristics of Systems
153
Содержание 7012 397
Страница 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 2: ......
Страница 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 11: ...Appendix Notices 385 Index 387 Contents ix...
Страница 12: ...x Site and Hardware Planning Information...
Страница 16: ...xiv Site and Hardware Planning Information...
Страница 18: ...xvi Site and Hardware Planning Information...
Страница 26: ...8 Site and Hardware Planning Information...
Страница 238: ...220 Site and Hardware Planning Information...
Страница 246: ...228 Site and Hardware Planning Information...
Страница 284: ...266 Site and Hardware Planning Information...
Страница 296: ...278 Site and Hardware Planning Information...
Страница 366: ...348 Site and Hardware Planning Information...
Страница 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Страница 374: ...128 Port Async Controller Cable Planning Chart Controller Line Interface 356 Site and Hardware Planning Information...
Страница 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Страница 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Страница 382: ...7318 Serial Communications Network Server Cable Planning Chart 364 Site and Hardware Planning Information...
Страница 384: ...366 Site and Hardware Planning Information...
Страница 402: ...384 Site and Hardware Planning Information...
Страница 404: ...386 Site and Hardware Planning Information...
Страница 413: ......
Страница 414: ...Printed in USA SA38 0508 20...
Страница 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...