S70, S7A and S80 I/O Rack
Dimensions
Height
1577 mm
62.0 in.
Width
650 mm
25.5 in.
Depth
1019 mm
40.1 in.
Weight
1
(Base Rack)
159 kg
349 lbs.
Electrical
(see specifications for drawers or enclosures)
Temperature
Requirements
(see specifications for drawers or enclosures)
Humidity
Requirements
(see specifications for drawers or enclosures)
Noise Emissions
(see specifications for drawers or enclosures)
Clearances
Front
Back
Left
Right
Install/Air Flow
Maintenance of a proper service clearance should allow proper air flow.
Service
See “Service Clearances for System in an S70, S7A, or S80 I/O Rack.”
1. Configuration dependent, base weight plus weight of drawers.
Service Clearances for System in an S70, S7A, or S80 I/O Rack
The amount of space needed by the units during service is indicated by large box of the footprint. For
complete specifications, see “S70, S7A and S80 I/O Rack.”
For multiple racks placed side by side, the left and right service clearances apply only to the leftmost and
rightmost rack.
Note:
If you are planning to install an S70, S7A or S80 in an RS/6000 SP System environment, see
RS/6000
SP Planning Volume 1, Hardware and Physical Environment
(GA22-7280) for system
planning information.
54
Site and Hardware Planning Information
Содержание 7012 397
Страница 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 2: ......
Страница 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 11: ...Appendix Notices 385 Index 387 Contents ix...
Страница 12: ...x Site and Hardware Planning Information...
Страница 16: ...xiv Site and Hardware Planning Information...
Страница 18: ...xvi Site and Hardware Planning Information...
Страница 26: ...8 Site and Hardware Planning Information...
Страница 238: ...220 Site and Hardware Planning Information...
Страница 246: ...228 Site and Hardware Planning Information...
Страница 284: ...266 Site and Hardware Planning Information...
Страница 296: ...278 Site and Hardware Planning Information...
Страница 366: ...348 Site and Hardware Planning Information...
Страница 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Страница 374: ...128 Port Async Controller Cable Planning Chart Controller Line Interface 356 Site and Hardware Planning Information...
Страница 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Страница 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Страница 382: ...7318 Serial Communications Network Server Cable Planning Chart 364 Site and Hardware Planning Information...
Страница 384: ...366 Site and Hardware Planning Information...
Страница 402: ...384 Site and Hardware Planning Information...
Страница 404: ...386 Site and Hardware Planning Information...
Страница 413: ......
Страница 414: ...Printed in USA SA38 0508 20...
Страница 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...