7026 Model H70 (Enterprise Server)
Dimensions
Height
350 mm 13.8 in.
8 (EIA Units)
Width
443 mm 17.4 in.
Depth
875 mm 34.2 in.
Weight
Minimum configuration
71 kg 157 lbs.
Maximum configuration
89 kg 195 lbs.
Electrical
Power source loading typical
¹
in kVA
0.46
Power source loading maximum
¹
in
kVA
0.691
Voltage range (V ac)
200 to 240
Frequency (hertz)
50 or 60
Thermal output (typical)
1485 Btu/hr
Thermal output (maximum)
2818 Btu/hr
Power requirements (typical)
434 watts
Power requirements (maximum)
650 watts
Power factor
0.9 - 0.98
Inrush current
²
50 amps
Maximum altitude
³
915 m (3000 ft.)
Temperature Requirements
³
Operating
10 to 40°C
(50 to 104°F)
Non-Operating
10 to 52°C
(50 to 125.6°F)
Humidity Requirements
Operating
Non-Operating
(Noncondensing)
8 to 80%
8 to 80%
Wet Bulb
27°C (80.6°F)
27°C (80.6°F)
Noise Emissions
⁴
Operating
Idle
L
WAd
6.2 bels
5.9 bels
L
pAm
N/A
N/A
<L
pA
>
m
43 dBA
40 dBA
Impulsive or prominent discrete tones
No
No
Clearances
Front
Back
Left
Right
Install/Air Flow
Maintenance of proper service clearances should allow proper air flow.
Service
(See service clearances for the “7015 System Rack R00” on page 41)
1. The power source loading is calculated using the power factor = 0.94.
2. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
3. For altitudes above 915 meters, the maximum temperature limit is derated by 1 degree C for every 137 meters of
elevation above 915 meters.
4. See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
76
Site and Hardware Planning Information
Содержание 7012 397
Страница 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 2: ......
Страница 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Страница 11: ...Appendix Notices 385 Index 387 Contents ix...
Страница 12: ...x Site and Hardware Planning Information...
Страница 16: ...xiv Site and Hardware Planning Information...
Страница 18: ...xvi Site and Hardware Planning Information...
Страница 26: ...8 Site and Hardware Planning Information...
Страница 238: ...220 Site and Hardware Planning Information...
Страница 246: ...228 Site and Hardware Planning Information...
Страница 284: ...266 Site and Hardware Planning Information...
Страница 296: ...278 Site and Hardware Planning Information...
Страница 366: ...348 Site and Hardware Planning Information...
Страница 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Страница 374: ...128 Port Async Controller Cable Planning Chart Controller Line Interface 356 Site and Hardware Planning Information...
Страница 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Страница 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Страница 382: ...7318 Serial Communications Network Server Cable Planning Chart 364 Site and Hardware Planning Information...
Страница 384: ...366 Site and Hardware Planning Information...
Страница 402: ...384 Site and Hardware Planning Information...
Страница 404: ...386 Site and Hardware Planning Information...
Страница 413: ......
Страница 414: ...Printed in USA SA38 0508 20...
Страница 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...