Apply engine coolant to the O-ring .
Install a new O-ring.
Connect the water hoses.
Pour engine coolant. (Refer to page 2-20)
Pour engine oil. (Refer to page 2-10)
Apply SUPER GREASE A to the impeller shaft.
SUPER GREASE A
Install the impeller to the water pump body.
Fix the impeller shaft with the E-ring .
Fill the bearing with engine oil until engine oil comes
out from the hole of the bearing housing.
5-13 COOLING SYSTEM
CAUTION
Use a new O-ring to prevent engine coolant
leakge.
Содержание GT 650
Страница 5: ...NOTE Difference between photographs and actual motorcycles depends on the markets ...
Страница 13: ...1 7 GENERAL INFORMATION EXTERIOR ILLUSTRATION ...
Страница 102: ...CARBURETOR 4 3 FUEL SYSTEM ...
Страница 138: ...LAMP HEADLAMP TURN SIGNAL LAMP TAIL BRAKE LAMP ELECTRICAL SYSTEM 6 16 ...
Страница 158: ...7 15 CHASSIS FRONT FORK ...
Страница 210: ...Prepared by HYOSUNG MOTORS MACHINERY INC 2nd Ed JUN 2004 Manual No 99000 94810 Printed in Korea ...