![HygroMatik CompactLine C01 Скачать руководство пользователя страница 49](http://html.mh-extra.com/html/hygromatik/compactline-c01/compactline-c01_manual_2192853049.webp)
Page 49
9.1 Maintenance Work
Mineral deposits precipitate and crystallize very differently in dif-
ferent types of water, even when two types have the same con-
ductivity and hardness levels (the various constituents in the
water interact differently).
Instructions on maintenance and cleaning intervals, or on elec-
trode service life, are based entirely on empirical data.
In most cases, the conductivity levels given in Section "Direc-
tions for Use" of these instructions can be considered normal.
Individual parameter setting of the control may be necessary.
In extreme cases, water pretreatment may be necessary (softe-
ning by dilution to approx. 4 - 8 °dH; decarbonization/partial
desalination to achieve target reductions in carbonate hard-
ness).
HygroMatik would be pleased to refer you to companies specia-
lizing in water treatment systems.
Cycle
Maintenance Work
4 Weeks after
initial operation
(with normal
water quality)
Visual inspection of electrical and
mechanical connections.
Remove mineral deposits from steam cyl-
inder, water drain hose and blow-down
pump.
Check electrodes for erosion.
Semi-annually
(with normal
water quality and
"normal" opera-
tion = 8h/day)
Visual inspection of electrical and
mechanical connections.
Remove mineral deposits from steam cyl-
inder, water drain hose and blow-down
pump.
Check electrodes for erosion.
Содержание CompactLine C01
Страница 78: ...Page 78 This page intentionally left blank ...
Страница 80: ...Page 80 15 View of housing ...