Installing power unit
VMU 1 ATEX II 2G IIC T4
en(us)
Page 29 / 60
BEWA VMU _4_ATEX-II2GIICT4_4066057 en-us 2015-10-12.doc
2015-10-12
Installing power unit
The VMUI is connected with bypass flow to an existing tank. The ion
exchange elements flow through at a precisely determined flow rate. During
this flow-through, the oil aging products in the fluid are removed. This way,
you can improve the oil quality by reducing the neutralization value.
Dimensioning size:
Model
Tank volume
VMU 1
< 16,000 liters
VMU 4
16,000 … 50,000 liters
Setting up the unit
Observe the following points when setting up the unit:
-
Set up the unit horizontally on a level surface.
Special mounting is not required.
Mobile power unit: activate the hand brake on the swivel casters or
secure the power unit against rolling away.
-
Install the power unit in the immediate vicinity of the reservoir to be
cleaned
-
Observe the ambient temperature range of: 10-40°C
-
Make sure that access to the main switch is unimpeded at all times
-
Observe that a minimum clearance of 0.8 m must remain free to the
right and left of the unit to allow unimpeded access for performing
servicing work
-
The stationary wheels of the power unit are electrically conductive. Do
not place them on an insulation layer
Содержание VarnishMitigation Unit
Страница 59: ......